Dura
-
Grip
OSHA
System Assembly
OSHA Compliance
Dura-Grip
Modular Building Access
Страница 1: ...Dura Dura Grip Grip OSHA OSHA System Assembly System Assembly OSHA Compliance Dura Grip Modular Building Access ...
Страница 2: ...OSHA OSHA Platform Components Platform Components Short Guardrail Legs Hardware Bag Long Guardrail Platform Cone Platform Leg Pads ...
Страница 3: ...OSHA OSHA Stair Components Stair Components Stair Riser Stair Rail Stair Cone ...
Страница 4: ...OSHA OSHA Step Assembly Step Assembly 1 Insert legs into platform cones with leg pads facing inwards 2 Using 5 16 x 2 bolt finger tighten at following heights 25 2 step system 34 3 step system ...
Страница 5: ...OSHA OSHA Step Assembly Step Assembly 3 Flip upright and attach stair riser using 2 5 16 x 4 long screws washers and hex nuts 1 each side ...
Страница 6: ...OSHA OSHA Step Assembly Step Assembly 4 Bring system flush to building so platform is level with threshold ...
Страница 7: ...OSHA OSHA Step Assembly Step Assembly 5 Lag platform to building with 3 x 3 lag screws 6 Adjust each leg as elevation dictates ...
Страница 8: ...OSHA OSHA Step Assembly Step Assembly 7 Insert short guardrail into platform cone so that it rests on 4 long bolts 8 Attach rail to building with 5 16 x 3 lag screws ...
Страница 9: ...OSHA OSHA Step Assembly Step Assembly 9 Insert long guardrail into platform cone and attach to short guardrail with 5 16 x 3 bolt provided ...
Страница 10: ...OSHA OSHA Step Assembly Step Assembly 10 Install the stair rail by inserting the bottom rail into platform cone then top make sure stair rail rests on the 4 long bolts ...
Страница 11: ...OSHA OSHA Step Assembly Step Assembly 11 Attach stair rail to long guardrail with 5 16 x 3 long bolt provided ...
Страница 12: ...OSHA OSHA Step Assembly Step Assembly 12 Make sure ground is level at bottom of first riser add or remove dirt as necessary must maintain 8 rise to remain code compliant ...
Страница 13: ...OSHA OSHA Step Assembly Step Assembly ...