
MAINTENANCE/INSPECTION PROCEDURE
4-21
(1) Greasing guidelines
Apply grease, with a cleaning patch. Do not use excess
grease. It may come into contact with the tape transport
or drive system. Wipe any excess and clean with clean
ing patch wetted in Isopropyl Alcohol.
(2) Periodic greasing
Grease specified locations every 5,000 hours.
5-2) Greasing
NOTE:Greasing Points
3
5
6
1
2
4
1) Loading Path Inside & Top side
2) Base Tension Boss inside Hole
3) Arm Assembly F/L "U" Groove
4) Arm Take-up Rubbing Section
5) L/D Motor Gear Wheel Part
6) Shaft
7) Arm Assembly F/L of Buming
Inside Hole
8) Reel S, T Shaft (G381:Yellow)
9) Brake T Groove
Guide Rail
Base Loading
Gear Drive
Gear Sector
Gear Cam
Gear Part
Bracket Side (L)
Bracket Assembly Door
5
7
8
1
2
6
4
3
1) Loading Path Inside & Top side
2) Shaft
3) Gear Rack F/L Moving Section
4) Shaft
5) Lever Tension Groove
6) Clutch Assembly D33 Shaft
7) Brake "S" Rubbing Section
Chassis (Top)
Chassis (Bottom)
Guide Rack F/L
Gear Rack F/L
Содержание HV-DX1E
Страница 30: ...MEMO 3 19 ...
Страница 32: ...3 32 3 33 2 TU IF NICAM A2 CIRCUIT DIAGRAM EE MODE VIDEO TU MODE AUDIO SANYO SCART ...
Страница 35: ...3 38 3 39 5 SCART JACK CIRCUIT DIAGRAM SANYO SCART DX1EV SP DX1UK ...
Страница 41: ...3 50 3 51 2 KEY P C BOARD LOCATION GUIDE 3 CLOCK P C BOARD LOCATION GUIDE ...
Страница 56: ...3 68 3 69 3 MPEG CIRCUIT DIAGRAM ...
Страница 59: ...3 74 3 75 6 SCART JACK CIRCUIT DIAGRAM ...
Страница 63: ...3 82 3 83 PRINTED CIRCUIT DIAGRAMS 1 MAIN P C BOARD TOP VIEW LOCATION GUIDE ...
Страница 64: ......
Страница 65: ......
Страница 88: ...4 22 GEAR F R GEAR AY P2 P3 Lever F R Base Tension Boss CAM ...
Страница 102: ......
Страница 103: ......
Страница 125: ...July 02 K SANYO Electric Co Ltd Osaka Japan ...