–17–
the “CAM,MECHANISM L
(5K000)
” are aligned correctly,
the shafts on either side of the “COMPL, HOLDER,PINCH
EXIT
(5B000)
” will slip down at the same time. If not
correctly aligned, the timing of the shaft drop will be off.
9.
If, on completion of step 8, the Cam Mechanism is out of
phase, repeat steps 1 to 8.
10. Upon completion of installing the “COMPL,MOTOR CAM
(6A000)
” correctly, rotate the worm gear on it until the
indication shown in the mechanism mode verification hole
become [1].
11. Referring to section 3-6, adjust the tension of the
“BELT,MOTOR STEP
(4J000)
”.
COMPL,MOTOR CAM
(6A000)
ASSY,GEAR,
CAM
(5J000)
SCR S-TPG BIN
2.6X4
(6B000)
A
B
FIXER
(7Q000)
Fig. A
Portion A
Arrow B
Arrow A
Push
Hooks on the
“GUIDE,
CASSETTE R
(3B100)
”
Fig. B
Worm gear
Fig. 3-9-1
COMPL,MOTOR
CAM
(6A000)
Fig. E
Fig. D
Portion A
Portion B
Portion C
Fig. C
Dowel
Dowel
Dowel
Mechanism Mode Verification Hole
Fig. 3-9-2
CAM,MECHANISM L
(5K000)
Fig. F
Portion F
Portion E
Front side
Front side
Fig. G
Fig. H
ASSY,CHASSIS L
(N.S.P.)
(7C000)
ASSY,GEAR,CAM
(5J000)
CAM,MECHANISM R
(5L000)
C
D
Shaft of the
“COMPL,HOLDER,
PINCH EXIT
(5B000)”
CAM,
MECHANISM
L
(5K000)
Shaft of the
“COMPL,HOLDER,
PINCH EXIT
(5B000)”
CAM,
MECHANISM
R
(5L000)
Hole
Hole
Slot1
Shaft1
Note: Fig. F and Fig. G
are bottom views of the
mechanism.
Fig. 3-9-3
Shaft of the
“COMPL,HOLDER,
PINCH EXIT
(5B000)”
Shaft of the “COMPL,
HOLDER,PINCH EXIT
(5B000)”
Note: Fig. 3-9-4 is bottom views of the mechanism.
Portion H of the
“CAM,MECHANISM R
(5L000)”
Portion G of the
“CAM,MECHANISM L
(5K000)”
Fig. 3-9-4
Содержание DVP-P1
Страница 21: ... 21 MEMO ...
Страница 30: ...Mar 04 YU Printed in Japan SANYOElectricCo Ltd Osaka Japan ...