7.0 COMMISSIONING

7.1 FILLING THE UNIT WITH WATER

• 

Check Expansion Vessel pre-charge pressure. The vessel is supplied pre-charged to 3.5 bar to match the con- 

 

trol pressure of the Pressure Reducing Valve. The pre-charge pressure is checked using a car tyre gauge by  

 

unscrewing the plastic cap opposite the water connection. 

• 

Check all connections for tightness including the immersion heater(s). An immersion heater key spanner is  

 

supplied for this purpose.

• 

Ensure the drain cock is 

CLOSED.

 

• 

Open a hot tap furthest from the Santon PremierPlus solar.

• 

Open the mains stop cock to fill the unit. When water flows from the tap, allow to run for a few minutes to   

 

thoroughly flush through any residue, dirt or swarf, then close the tap.

• 

Open successive hot taps to purge the system of air.

7.2 SYSTEM CHECKS

• 

Check all water connections for leaks and rectify as necessary.

• 

Remove the Pressure Reducing Valve headwork to access the strainer mesh, clean and re-fit.

• 

Manually open, for a few seconds, each relief valve in turn, checking that water is discharged and runs freely  

 

through the tundish and out at the discharge point.  

• 

Ensure that the valve(s) reseat satisfactorily.

7.3 SOLAR PRIMARY CIRCUIT

Fill the solar primary circuit following the instructions provided with the solar hydraulic controls. The cylinder tem-

perature control probe supplied with the solar controller must be fully inserted into the pocket in the lower controls 

housing and the cable securely clamped. Heating by the solar primary circuit is controlled by the solar controller, 

refer to the manufacturers installation instructions for details of how to set up and connect the solar primary circuit. 

The solar controller should be programmed to give a maximum storage temperature in the PremierPlus solar of 

70

o

C, 60

o

C is recommended to minimise scaling.

7.4 DIRECT UNITS

Switch on electrical supply to the immersion heater(s) and allow the PremierPlus solar to heat up to normal working 

temperature (60ºC recommended, see Fig 7, page 11 for adjustment details). If necessary the temperature can be 

adjusted by inserting a flat bladed screwdriver in the adjustment knob on top of the immersion heater thermostat 

and rotating. 

The  adjustment  range  on  the  spindle  represents  a  temperature  range  of  10

o

  to  72

o

C.  Check  the  operation  of  

thermostat(s) and that no water has issued from the expansion relief valve or temperature/pressure relief valve 

during the heating cycle.

7.5 Secondary Heating Coil 

Fill the indirect secondary circuit following the boiler manufacturer’s commissioning instructions. To ensure the 

PremierPlus solar auxillary heat exchanger is filled, the 2 port motorised valve (supplied) should be manually opened 

by moving the lever on the motor housing to the FLUSHING ONLY setting. When the circuit is full return the lever 

to the NORMAL USE position. Switch on the boiler, ensure the programmer is set to Domestic Hot Water and allow 

the Premier Plus Solar to heat up to a normal working temperature (60

o

C recommended, see Fig 7 for adjustment 

details). If necessary the temperature can be adjusted by inserting a flat bladed screwdriver in the adjustment knob 

(located on top of the thermostat mounting bracket - see Fig.7, page 11) and rotating. The minimum thermostat 

setting is 10

o

C. The adjustment range on the spindle represents a temperature range of 10

o

 to 72

o

C. Check the 

operation of the indirect thermostat and 2 port motorised valve and that no water has issued from the expansion 

relief valve or temperature/pressure relief valve during the heating cycle.

7.6 BENCHMARK

TM

 LOG BOOK

On completion of the installation and commissioning of the PremierPlus solar the Benchmark

TM

 “Installation, Com-

missioning and Service Record Log Book” should be completed and signed off by the competent installer or com-

missioning engineer in the relevant sections.

The various system features, location of system controls, user instructions and what to do in the event of a system 

failure should be explained to the customer. The customer should then countersign the Benchmark

TM

 log book to 

accept completion.

The log book should be left with the customer along with these instructions. The log book includes sections that 

should be filled out when any subsequent service or maintenance operation is carried out on the Premier Plus 

system.

Содержание PREMIER PLUS

Страница 1: ...ENTS Premier Plus unvented solar water heater incorporating immersion heater s and thermal controls Factory fitted temperature pressure relief valve Cold water combination valve Expansion vessel Expan...

Страница 2: ...pment for their needs that it is installed commissioned and serviced in accordance with the manufacturer s instructions by competent persons and that it meets the requirements of the appropriate Build...

Страница 3: ...SUPERVISION WARNING Do not switch on if there is a possibility that the water in the heater is frozen OPERATIONAL SUMMARY Indirect models in conformance with BS EN 12897 2006 Maximum mains water suppl...

Страница 4: ...ements of the CE marking directive and is KIWA approved to show compli ance with Building Regulations Section G3 The following instructions are offered as a guide to installation which must be carried...

Страница 5: ...inal fittings It is advantageous in many mixer showers to have balanced hot and cold water supplies In these instances a balanced pressure cold water connection should be placed between the cold water...

Страница 6: ...pansion vessel should allow access to recharge the pres sure as and when necessary this can be done using a normal car foot pump It is recommended that the expansion vessel is adequately supported An...

Страница 7: ...IMENSIONS mm AUXILLARY VOLUME litres AUXILLARY COIL SURFACE AREA sq m RATING kW HOT WATER DRAW OFF Litres to 40 C HEATING TIME DIRECT MINS SOLAR SURFACE AREA sq m NOMINAL CAPACITY litres E DIRECT B IN...

Страница 8: ...rom a single unvented hot water system dischargeby way of the same manifold that is used by the safety devices the manifold should be factory fitted as part of the hot water storage system unit or pac...

Страница 9: ...revent contact whilst maintaining visibility and d discharges at high level e g into a metal hopper and metal downpipe with the end of the discharge pipe clearly visible or onto a roof capable of with...

Страница 10: ...ee Building Regulation G3 section 3 56 Table 4 and worked example Valve outlet size Minimum size of discharge pipe D1 Minimum size of discharge pipe D2 from tundish Maximum resistance allowed expresse...

Страница 11: ...le Fig 6 Direct Electrical connections schematic THERMAL CUT OUT RESET BUTTON SPINDLE POSITIONS MINIMUM TEMP 10 C MAXIMUM TEMP 72 C APPROX 60 C ROTATE SPINDLE CLOCKWISE FOR TEMPERATURE INCREASE AND CO...

Страница 12: ...CUT OUT PROBE CONTROL ASSEMBLY POWER SUPPLY TO SOLAR CONTROLLER L N E SOLAR CONTROLLER L N 1 2 3 Control Housing Details Element Connections 1 5mm 3 Core HOFR sheathed cable Indirect control wiring F...

Страница 13: ...ar circulation is stopped 5 0 INSTALLATION DIRECT UNITS 5 1 PLUMBING CONNECTIONS Direct units require the following pipework connections Cold water supply to and from inlet controls Outlet to hot wate...

Страница 14: ...located under the terminal cover mounted on the side of the unit The supply cable s must be routed through the cable grip s in the terminal housing DISCONNECT FROM MAINS SUPPLY BEFORE REMOVING ANY CO...

Страница 15: ...PERATION OF THEIR PRODUCTS WITHIN THE SYSTEM KEY Bl BLUE Br BROWN G GREY O ORANGE GY GREEN YELLOW DHW DOMESTIC HOT WATER HTG HEATING DHW OFF 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Bl Br G O GY L N N L...

Страница 16: ...n be adjusted by inserting a flat bladed screwdriver in the adjustment knob on top of the immersion heater thermostat and rotating The adjustment range on the spindle represents a temperature range of...

Страница 17: ...nscrew immersion heater backnut s and remove immersion heater from the unit A key spanner is supplied with the PremierPlus solar unit for easy removal tightening of the immersion heater s Over time th...

Страница 18: ...ir When completely full and purged check system for leaks The heating source immersion heater s boiler or solar primary circuit can then be switched on 8 7 BENCHMARKTM LOG BOOK On completion of any ma...

Страница 19: ...hermostat and thermal cut out These controls must be wired in series with the 2 port motorised zone valve supplied to interupt the flow of primary water around the heat exchanger coil when the control...

Страница 20: ...hen drawing water from the unit SPARE PARTS A full range of spare parts are available for the PremierPlus cylinder range See Table 6 Page 22 Refer to the technical data label on the unit to identify t...

Страница 21: ...tly Check wiring and or plumbing connections to motorised valve Water discharges from expansion valve INTERMITTENTLY Expansion vessel charge pressure has reduced below 3 5bar or set to high See Mainte...

Страница 22: ...odels 95 607 863 13 Expansion vessel 18 litre 170 and 210 litre models 95 607 864 14 Expansion vessel 24 litre 250 and 300 litre models 95 607 612 15 Blanking plate assembly 95 605 881 16 Nut olive pa...

Страница 23: ...23 18 4 23 20 3 24 17 19 22 1 25 Fig 13 Indirect Solar...

Страница 24: ...24 4 3 17 22 20 2 1 17 24 23 Fig 14 Direct Solar...

Страница 25: ...e BenchmarkTM Commissioning Checklist Service Record included in this product Guide has been completed Regular maintenance has been carried out by a competent person in accordance with the requirement...

Страница 26: ...26...

Страница 27: ...27...

Страница 28: ...k Newey Eyre Specialist Products Division Please Contact your Local Branch UK Spares Ltd Unit 1155 Aztec West Almondsbury Bristol BS32 4TF Tel 01454 620500 William Wilson Ltd Unit 3A 780 South Street...

Отзывы: