Santoemma Sabrina-Foam-Light Скачать руководство пользователя страница 2

Structure of the machine 

 

Sabrina Foam Light is made by the following parts: 

 Machine 

body, 

  Accessory to spray foam, complete with its solution pipe for the connection 

to the machine body, 

  Vacuum plastic hand tool and vacuum hose for the connection to the 

machine body. 

 

The machine body contains all the necessary devices for spraying foam and then 

vacuuming: 

  The lower tank, containing the water and chemical solution used for 

cleaning, 

  The upper tank, used to recovery the dirt sucked by the vacuum motor, 

  The solution pump and the vacuum motor, situated inside the lower tank, 

  The control panel for the pump and the motor, 

  The air compressor and the compressed air tank, located in the lower part, 

  The control panel for the regulation of foam, 

  The coupling for the incoming compressed air, located in the regulation 

panel.  

 

Preparation for work 

To prepare the machine for work, do the following operations: 

1.  Insert the male quick disconnect coupling (located at the end of the solution 

pipe coming out from the foam regulation panel) into the female quick 

disconnect coupling (located at the pump outlet). In this way you allow the 

solution sprayed by the pump to enter inside the lower part, where the foam is 

generated. 

2. Check that the valve at the foam outlet from the compressor is closed. 

Connect the hose to spray foam to the coupling from which the foam goes out 

Содержание Sabrina-Foam-Light

Страница 1: ...r with a special detergent T FOAM Unlike a normal solution of water and detergent this foam does not penetrate in the depth of the textile but acts only on the superficial layer just where the dirt is...

Страница 2: ...ntrol panel for the pump and the motor The air compressor and the compressed air tank located in the lower part The control panel for the regulation of foam The coupling for the incoming compressed ai...

Страница 3: ...am and then the hand tool to the vacuum hose 5 Raise the recovery tank after releasing the lateral hooks fixing it to the lower tank 6 Put some fresh or warm water into the solution tank through the c...

Страница 4: ...ary for the production of foam directly form the external compressor NOTE Please check that the compressor connected to the machine is able to provide the quantity of foam needed by the machine withou...

Страница 5: ...Motor Switch Interruttore Pompa Air Input Pressure regulation Manometer Foam outlet Pump outlet Regulation panel Control panel Pump Switch...

Страница 6: ...not spray and vacuum foam at a time By doing so the foam could be sucked by the motor and this could cause a damage You have to wait some seconds about 20 or 30 in order to be able to vacuum foam In...

Страница 7: ...er 3 bars can generate a too liquid foam while pressure values higher than 3 bars can generate a too dry foam If for any reason the regulation of the pressure in your machine should change you can res...

Страница 8: ...l in the solution tank and letting it work from some hours Use the same products used for dishwashers Empty and then rinse the solution tank This operation should be done every 6 8 months 6 Periodical...

Отзывы: