
2/3
Install the L-Bracket (SC-9903) on the Roll Bar
Base (A) (SC-932) and install Butt Plate (B) (SC-
1900) on the L-Bracket.
Since this is not the nal installation, do not
tighten bolts.
Mark the position of U-Bolts (as measured above) on the back of the partition wall pipe.
Warning: After installation the gun must have enough room under the ceiling with leaving room on
both sides.
SC-934-1
Fixed Overhead Pump Shotgun Gun Rack with SC-1 Lock
A
B
2
Install Butt Plate
1
Install Gun Lock
3
Adjust the parts
Assemble the setup on a table and if the gun is in its proper position measure the location of
U-Bolts.
Keep the measurements and remove the Gun Lock and the L-Bracket from the 2 Roll Bar Base.
A
B
Install Gunlock (in case of SC-934-1)Install the Gun Lock
(SC-1) temporarily on Roll Bar Base (SC-932).Since this
is not the nal installation, do not tighten bolts.
4
Mark the U-Bolts
5
Install Base Plates
3X
7
Tighten the screws
Place your weapon into the setup, test and retest your installation by repeatedly
inserting and removing the weapon from the assembly.
When satis ed, tighten all screws and test again.
6
Assembly Elements
Install Gun Lock on Roll Bar Base (as shown in
Step 1) and on the L-Bracket (as shown in
Step 2).
How to use the
SC-9906 U-Bolts
A
B
C
D
Perforate the foam lining of the partition wall
pipe from back to front with the help of spikes
attached to the U-
Bolts.
Press hard on
the U-Bolts to reach
their nal position.
On the other side,
pull off the spikes
and install the 2 Roll
Bar Base (SC-932) by
tightening the bolts.