background image

 

 

User Manual 

 

1.3   Unpacking the JBOD Expansion Chassis 

 

The package contains the following items: 
• JBOD Expansion Chassis 
• Two power cords  
• One serial cable (phone-jack to DB9) 
• One external Mini SAS cable SFF-8088 to SFF-8088 
• Installation Reference Guide 
• Spare screws, etc. 

 

 

 

 

 

 

 

 

 

 

 

 
 

If any of these items are missing or damaged, please contact your dealer or vendor 
for assistance.

 

 

 
 
 
 
 
 
 
 
 
 
 

Содержание ACCUSTOR AS212X6

Страница 1: ...QUICK INSTALLATION GUIDE v1 0 ACCUSTOR AS212X6...

Страница 2: ...pply Fan Module PSFM 10 1 5 1 PSFM Panel 10 1 5 2 Power Supply Module LED 11 1 5 3 Fans of PSFM 11 1 6 LCD Display Panel 12 1 6 1 LCD Panel LED 12 1 6 2 LCD Panel Function Buttons 13 1 6 3 Menu Diagra...

Страница 3: ...it in with the environments which needed highly reliable and relentless data growth The JBOD Enclosure is also a versatile SAS2 SATA3 Disk Expansion system ideal for high capacity and scalability stor...

Страница 4: ...ling system contained in 1 module for efficient cooling 300W power supplies to meet the future HDD power consumption Enclosure Hardware expansion slots keep you up to date on the latest technologies I...

Страница 5: ...Yes with Lock Indicator Disk Status Indicator Access LED and Fail LED Enclosure Monitoring SES In Band SES via SAS of PS Fan Modules 2 x 300W with PFC of Fans per Module 1 Multi speed Power Status In...

Страница 6: ...ollowing items JBOD Expansion Chassis Two power cords One serial cable phone jack to DB9 One external Mini SAS cable SFF 8088 to SFF 8088 Installation Reference Guide Spare screws etc If any of these...

Страница 7: ...User Manual 7 1 4 Identifying Parts of the Expansion Chassis The illustrations below identify the various parts of the expansion chassis 1 4 1 Front View...

Страница 8: ...8 User Manual 1 4 2 Rear View 1 4 3 Expansion Drawer...

Страница 9: ...sed for assigning the Expansion Chassis ID Number Press the upper or lower button to select increase or decrease the Chassis ID Number RS 232 Port Used for upgrading the Firmware of JBOD controller in...

Страница 10: ...The Power Supply Fan Module panel has Power On Off Switch the AC Inlet Plug and a Power On Fail Indicator showing the Power Status LED indicating ready or fail Each fan within a PSFM is powered indep...

Страница 11: ...LED becomes RED When the switch of the PSFM is turned on the LED will turn GREEN When the Power On Fail LED is GREEN the PSFM is functioning normally 1 5 3 Fans of PSFM Each PSFM has 1 fan located bes...

Страница 12: ...ED will turn to RED and alarm will sound Fan Fail LED Turn RED when fan 1 or 2 fails or speed is lower than 3000 RPM Over Temperature LED If system temperature is over 70o C or disk temperatures excee...

Страница 13: ...ove between each menu Select button This is used to enter the option you have selected Exit button EXIT Press this button to return to the previous menu NOTE This button can also be used to silence th...

Страница 14: ...32C S 11 0 31C S 12 0 30C Power Status Good PSU A Good PSU B Good FAN Status Good MF PSU A 3409 RPM MF PSU B 3479 RPM Voltage Status Good 5V 5 23V 12V 12 33V Buzzer Status Disabled Disable Buzzer Enab...

Страница 15: ...ndicator lights One indicator light is used for Power On Error When this light is GREEN the power is on and everything is functioning normally When the Power On Error light is RED then an error has ha...

Страница 16: ...to the chassis or not Each carrier is also fitted with an ergonomic handle for easy carrier removal When the Lock Groove is vertical then the Drive Carrier is unlocked When the Lock Groove is horizont...

Страница 17: ...pansion chassis is running a Press Make sure the Lock Groove is in unlocked position Press the Carrier Open button and the Drive Carrier handle will flip open b Pull out an empty disk tray Pull the ha...

Страница 18: ...18 User Manual d Install the mounting screws on the bottom part to secure the drive in the disk tray e Slide the tray into a slot f Close the handle until you hear the latch click into place...

Страница 19: ...witch of JBOD Controller NOTE Depending on the SAS RAID card used in the Host Server the DIP switch must be set according to the tables below DIP Switch Setting SAS RAID Card Note 0 0 1 1 0 0 0 0 Arec...

Страница 20: ...re 2 Configure the DIP Switch in the JBOD controller to the appropriate setting Note that 0 is ON and 1 is OFF Example settings LSI 3 Reinsert the Expansion Drawer into the enclosure SWITCH 1 2 3 4 5...

Страница 21: ...he JBOD firmware please shut down server first or make sure no array setting on the JBOD disks The new Firmware will effective after JBOD power cycle Steps 1 Used RS 232 Port Phone jack to DB9 link Pr...

Страница 22: ...22 User Manual 2 Select Transfer Send File You must finish within 25 seconds 3 Select your firmware file path and select Xmodem in the communication protocol and click transfer button...

Страница 23: ...User Manual 23 4 Wait for the transfer of file to complete...

Страница 24: ...24 User Manual 5 When the transfer and firmware update is complete please power cycle the JBOD 6 In command line type system info you can see the Expander firmware version...

Отзывы: