
Connection & Counter Hole Diagrams
3” hole in counter recommended for passage of
electrical cord & water/drain lines.
Counter hole placement recommended to be
center of machine and 17
”
inward from edge of
the drip tray.
First Start Procedure
Confirm the steam boiler has auto filled sufficiently and has not timed out by referencing the center water level
display section of the pressure gauge:
If machine has timed out, cycle machine off/on and allow to auto fill. If machine is still timing out, shut machine down and re-check
the inlet water line / filtration system and confirm water flow to machine.
When the machine has successfully auto filled the steam boiler, turn on all groups and confirm water flow. Turn
groups off and perform the first air purge of the hydraulic circuit whilst the machine is cold.
Steam Boiler Water Level Low
Steam Boiler Water Level Filling
Steam Boiler Water Level Filled