background image

V. Installation and commission

Fig.1

Fig.2

1. Install DZ-LR08 with 2

×

M4 screws, and make sure it has been install steadily.

2. Rechargeable battery can be installed on base, plug in rechargeable battery socket ( battery

plug in battery socket)

3. Install the sounder beacon on base. The sounder beacon operates with indicator (green)

flashes per 30s.

4. If the sounder beacon receive alarm signals, indicator (red) will remain on, and provide alert

Отзывы: