TEMPERATURE CONTROL HANDLE INSTALLATION & OPERATION — ALL MODELS
The Calibration ring is pre-installed and set at the 12 o’clock position at 38°C DO NOT REMOVE
Place the diverter handle in position. Tighten the grub screw from underneath until secure. Insert the
screw cover.
To test function, turn the handle clockwise,
then
anti-clockwise, it should stop at the 12 o’clock
position, press the button to turn.
When turning the handle back clockwise, at the
point the button comes to the 12 o’clock position
a ‘click’ will sound and the button pop back up.
Содержание KOY
Страница 1: ...KOY ZEPHYR THERMOSTATIC SHOWER MIXER www sanipexgroup com ...
Страница 2: ......
Страница 4: ... ...
Страница 14: ...Note ...
Страница 15: ...Note ...
Страница 16: ...INM KOY ZEP THERMO_MIXER 08 21 www sanipexgroup com ...