4
5
1.
Purpose: Flush the impurities and
silt in the pipe in case of the
blocking.
2.
Open the protective plastic sheet
and protective cover Turn on the
tap and
o
pen up the supply valve
rod to flush the pipe. Close the
spool and test the
pressure
resistance and tightness to make
sure there no leakage.
3.
Blocked all outlet of pipes with
plastic plugs(1/2) and turn on the
tap.
Check
whether the
connection port of the upper of
the outlet pipe are tight
and
the
status of pipeline pressure. Make
sure there is no leak-age.
4.
After the test of tightness, revet
the protective plastic sheet and
protective
cover.
Test of Water and Tightness
3
ON
HOT
COLD
Содержание BAGNODESIGN BDM-MLI-305 Series
Страница 1: ...BDM MLI 305 XX M LINE CONCEALED BASIN MIXER www sanipexgroup com...
Страница 2: ......
Страница 4: ...1 2 OFF HOT COLD...
Страница 7: ...Note...
Страница 8: ...INM MLI 305 XX 22 23 www sanipexgroup com...