Installation
Steps
for PVC, Cement Board Walls etc
.
NOTE
:
First steps from method # 1 will remain the same.
F
ix the
back
nut
followed by
rubber washer
to the bolt
on
the
back side of
the
board
or pvc
.
3
4
5
Installation complete.
Clean the connection
from
both
side
s
of
the
wall
and
push
body-jet
into
the outlet
connection
carefully.
2
Front
side of the fixing board
Back side of the fixing board
Содержание BAGNODESIGN BDD-ZEP-560 Series
Страница 1: ...BDD ZEP 560 XX ZEPHYR BODY JET 48X48MM www sanipexgroup com...
Страница 2: ......
Страница 7: ...Note...
Страница 8: ...IND ZEP 560 XX 02 22 www sanipexgroup com...