background image

12    S&C Instruction Sheet 761-525

Installation

Installing Pipe Couplings with Piercing 

Set Screws

 WARNING

Failure to properly install pipe couplings with piercing 
set screws can cause slippage of operating pipe, 
resulting in improper operation of the switch, arcing, 
equipment damage, or electrical shock .

STEP  7.  

To properly install piercing set screws:

(a)  Make sure the cutting tip of the piercing set 

screw does not protrude through the body of 
the clamp.

(b)  Insert the operating pipe section into the 

coupling and fi nger-tighten the clamp bolt(s).

(c)  Adjust the operating pipe to the correct 

length. Then, tighten the clamp bolt(s) to 
fi nal tightness.

(d)  Tighten the piercing set screw, piercing the 

pipe, and continue turning until a fi rm 
resistance is felt.

(e)  Make sure the clamp bolt(s) are tight. See 

Figure 8.

Piercing set screw in shipping position (cutting tip 

does not pro trude through body of the clamp)

Operating pipe installed, clamp bolt fully tightened, 

and piercing set screw in final position

Clamp bolt

Clamp 

Coupling body

Piercing 

set screw

Slug pierced

from pipe

Figure 8. Installing the pipe couplings with piercing set screws.

Содержание Alduti-Rupter Switches Outdoor Distribution

Страница 1: ...Safety Instructions 4 Replacement Instructions and Labels 4 Location of Safety Labels 5 Safety Precautions 6 Shipping and Handling Inspection 7 Packing 7 Handling 8 Installation Mounting to Wood 9 Unc...

Страница 2: ...rt product literature Retain this Instruction Sheet This instruction sheet is a permanent part of your Alduti Rupter Switch Designate a location where you can easily retrieve and refer to this publica...

Страница 3: ...or implied or arising by operation of law course of dealing usage of trade or otherwise are excluded The only warranties are those stated in Price Sheet 150 or Price Sheet 153 and THERE ARE NO EXPRESS...

Страница 4: ...ecautions are not followed NOTICE NOTICE identifies important procedures or requirements that can result in product or property damage if instructions are not followed Following Safety Instructions If...

Страница 5: ...e Description Part Number A DANGER Electrocution Hazard G 6580 1 B WARNING Piercing Set Screws G 3176R1 C WARNING Handle Operation G 4400R5 D WARNING Electrocution Hazard Grounding Strap G 6596 This p...

Страница 6: ...othing in accordance with safe operating procedures and rules 4 SAFETY LABELS AND TAGS Do not remove or obscure any of the DANGER WARNING CAUTION or NOTICE labels and tags Remove tags ONLY if instruct...

Страница 7: ...SX suffix They include S1 One tubular fiberglass insulating section in vertical operating shaft S2 One Cypoxy Insulator unit in vertical operating shaft S6 Key interlock single lock for a locked open...

Страница 8: ...fully Closed position during installation of the interphase and vertical operating pipe sections S C recommends tying the switch blades to their jaw contacts with wire or a cable tie WARNING DO NOT li...

Страница 9: ...n the same order in which they will be mounted on the structure Protect the bearings from contamination by dirt mud oil etc If necessary use blocks to keep the bearings clear of the ground Attaching C...

Страница 10: ...ilure to lift the switch properly can result in switch damage causing improper operation arcing or electrical shock STEP 4 Hoist the switch poles using the lifting angles provided and bolt them into p...

Страница 11: ...with blades against their blade stops and the switch drive lever within 1 16 inch 2 mm of the closed stop bolt Tie the switch blades to their stationary main contact assemblies See Figure 7 Figure 6...

Страница 12: ...the operating pipe section into the couplingandfinger tightentheclampbolt s c Adjust the operating pipe to the correct length Then tighten the clamp bolt s to final tightness d Tighten the piercing s...

Страница 13: ...sure of all three poles STEP 9 Attach the interphase drive lever to the interphase or outboard pipe section in the position shown on the erection drawing See Figure 10 Make sure the lever is at the 45...

Страница 14: ...nstall the upper section of vertical operating pipe between the interphase drive lever coupling and the uppermost rod guide with the rod guide arm pointing upward at a 45 degree angle See Figure 13 A...

Страница 15: ...y inch 6 mm of thread should extend through the coupling Tighten the locknut See Figure 15 If suffix S8 or S9 is specified refer instead to S C Instruction Sheet 769 510 Type AS 10 Switch Operators If...

Страница 16: ...page 17 STEP 16 Fasten the free end of the grounding strap to the lowest vertical operating pipe section a few inches above the operating handle assembly with the U bolt connector provided for this p...

Страница 17: ...ing linkage has been taken up STEP 19 If there is still slack repeat the procedure in Step15onpage16butmovetheoperatinghandle more than 20 degrees in the opening direction before torquing the clamp bo...

Страница 18: ...extended engages a slot in the locking disc on the operat ing handle See Figure 21 STEP 21 Block one of the two slots in the locking disc with the blocking screw provided The slot to be blocked depend...

Страница 19: ...h will occur if the energized switch is operated slowly or left in the partially Open or Closed position Check to make sure the following conditions exist a With the operating handle as far as it will...

Страница 20: ...isrequired Move the operating handle to its mid position to take the strain off the operating pipe linkage and loosen the two nuts that clamp the adjustable arm of the interphase drive lever See Figur...

Страница 21: ...r readjusting be sure to retighten the clamp bolt and piercing set screw on the pipe coupling at the rod guide or interphase drive lever coupling immediately above the operating handle the nuts on the...

Страница 22: ...ur if the energized switch is operated slowly or left in the partially Open or Closed position a As the blade moves in the closing direction clearance between the blade opening cam and the interrupter...

Страница 23: ...e parallel to the sweep of the blades and the blades must pass over the interrupter with approxi mately equal clearance on both sides See Figure 32 e If adjustment is required loosen the nuts thatfast...

Страница 24: ...tationarymaincontactassemblies See Figure 34 The shunt contacts may be bent as required to conform to these conditions If any of the conditions described in this step cannot be achieved contact the ne...

Страница 25: ...Conductors When high voltage conductors are to be connected using aluminum alloy body connectors the following procedures should be employed Thoroughly wire brush the current transfer surfaces of eac...

Страница 26: ...precautions may result in serious injury or death NOTICE This interrupter switch is not intended for breaking fault currents STEP 26 To operate the Alduti Rupter Switch a Remove the padlock from the l...

Отзывы: