S&C 6802 Скачать руководство пользователя страница 6

6

    S&C Instruction Sheet 1045-568 

Step 8

Return to the 

Operation

 screen and click 

CHANGE

 to 

Enable

 Automatic  

Operation

 . On the 

Setup > General > Automatic Operations

 screen set 

Features Enabled

 

to 

Sectiona Phase Loss

 for both switches, or determine the most appropriate 

setting for your application, and enable the same feature set for both switches . Enter 
settings for all the other parameters . Refer to S&C Instruction Sheet 1045-530 

Setup

, or 

press F1 for detailed information on each parameter . Go to the 

Validate/Apply

 screen 

and click 

Apply

 .

Step 9

Go to the 

Setup > Communications > DNP

 screen . If SCADA communication is used, 

enter the required parameters . Also enter a non-zero RTU address for the 6802 that 
matches the RTU address you enter in the next step . See Instruction Sheet 1045-530 for 
more information about communication settings .

Step 10

Go to the 

Setup > Restoration > IntelliTEAM SG > Team 1 Setup

 screen . See  

Figure 2 . Enter a 

Team ID

 and set 

Team Logic

 to 

IT-II

 . Adjust the 

Return to Normal Timer

  

if you want to use that function .

Overhead Source-Transfer Software

Step 11

Configure 

Rec 1

 for 

Sw 1

 and 

Rec 2

 for 

Sw 2

 . Switch 1 is connected to the rear 

FIC next to the bracket mount, Switch 2 is connected to the front FIC near the  
enclosure door . Enter the same 

RTU Address

 for both 

Rec 1

 and 

Rec 2

; use the same 

RTU Address

 you entered in Step 10 . Specify which switch is 

Normally Closed

 and 

which is 

Normally Open

 . For the 

Normally Closed

 switch set the 

Normal Switch  

Function

 to 

Src/Sub

 and the 

Return to Normal Mode

 to 

Close

 . For the 

Normally Open

 

switch set the 

Normal Switch Function

 to 

Tie/Sub

 and set the 

Return to Normal Mode

 

to 

Close

 . “

Close

” defines 

Return to Normal

 as a closed transition mode or make-before-

break . At 

Return to Normal

 the normally closed switch will close and then the normally 

open switch will open—the feeders are temporarily tied together, but there is no outage .

Figure 2. IntelliTeam SG Setup for Team 1.

Содержание 6802

Страница 1: ...le of Contents Section Page Section Page Introduction Qualified Persons 2 Read this Instruction Sheet 2 Retain this Instruction Sheet 2 Warranty 2 Safety Information Understanding Safety Alert Message...

Страница 2: ...ction Sheet This instruction sheet is a permanent part of your S C Model 6802 Automatic Switch Control Designate a location where you can easily retrieve and refer to this publication Warranty The sta...

Страница 3: ...ons are not followed NOTICE NOTICE identifies important procedures or requirements that can result in product or property damage if instructions are not followed Following Safety Instructions If you d...

Страница 4: ...Operating Instructions and the Setting Phase and Ground Overcurrent Levels Instruction Sheet 1045 530 available at the S C Website sandc com Familiarize yourself with the features procedures warnings...

Страница 5: ...eneral Site Related screen enter the installation dependent parameters for voltage The Loss of Voltage Threshold setting can be increased as reliability and power quality dictate for a particular load...

Страница 6: ...toration IntelliTEAM SG Team 1 Setup screen See Figure 2 Enter a Team ID and set Team Logic to IT II Adjust the Return to Normal Timer if you want to use that function Overhead Source Transfer Softwar...

Страница 7: ...et it back to Running and click OK Step 14 Wait for the control to go into the Ready mode by watching the LCD on the control Step 15 Save a snapshot of the control data The Save Snapshot command is in...

Страница 8: ...Printed in U S A...

Отзывы: