SF 1LB Manual – Page 4
Step 4:
•
Turn gas about 1/4 to 1/2 on
•
Warm up machine about 15 min. then shut gas off not to exceed 400 degrees
Step 5:
•
Put green coffee in hopper 1/4 to 1 pound
•
Pull cooling tray vent knob to lessen air flow through drum while charging
green beans
•
Charge green beans
•
Close cooling tray vent
Step 6:
•
Turn on gas 1/4
•
Push red ignitor till you see fire is going through the hole on side
Step 7:
•
Turn gas on 3/4 to full
•
Allow temperature to read 435 to 465 degrees
•
Check roast with sampler and observe color through sight glass.
•
Roasting time will range from 12 to 16 minutes
Step 8:
•
Roast completed
•
Turn gas off
•
Pull cooling tray vent knob
•
Open door and discharge beans
•
Use sample scooper to stir beans
•
Close discharge door
•
Let coffee cool
Содержание SF1-LB
Страница 1: ...THE SAN FRANCISCAN MODEL SF1 LB COFFEE ROASTER ...
Страница 10: ...THE SAN FRANCISCAN MODEL SF1 LB CLEANING GUIDE ...
Страница 29: ...19 ...