background image

Assembling / Dissmebling  

 

27

Technical Specifications 

 
 

All contents in the specifications are subjected to change without notice. 
 

Dimensions 

  320mm (D) x 290mm (H) x 85mm (W) 

 
 

Power Supply F/F 

  Standard LFX 220W with PFC 

 
 

Slots & Sockets 

 Socket 775 

  DIMM Sockets x 2 

  PCI Express X16 Slots x 1 

 Power connector 

 Battery socket 

 

BIOS Management 

System BIOS: 

 Award BIOS

 

 

System BIOS compliance:

 

  ACPI 1.0b (S0, S1,S3, S4, S5) 

 APM 1.2 

 PnP 1.0a 

 SMBIOS 2.3 

 DMI 2.1 

 WfM 2.0 

 USB 2.0 

  Serial IRQ support for PC Card 

  Chassis intrusion detection

 

 TPM support 

 AMT support 

 VT support 

 

Power Management: 

 PCI PME support 

  Power failure recovery 

  USB Keyboard and mouse wake up 

  Remote on/off /Suspend to HDD 

 WOL/WOR 

 

Manageability

 

  Hard disk fault prediction (S.M.A.R.T) 

 Remote control management 

 
 

Содержание C2D900+

Страница 1: ...User Manual C2D900 Smallest pBTX Desktop...

Страница 2: ...on C2D900 is able to be placed both vertically and horizontally on office desktops It gives user the flexibility to arrange desktop space as desired C2D900 is also designed to hold legacy heavy CRT mo...

Страница 3: ...t yourself from possible injury and to minimize the risk of damage to the computer read and follow all the safety instructions mentioned in this manual A modem card will be bundled with the system and...

Страница 4: ...ng serious damage to it 6 Avoid using a telephone other than a cordless type during an electrical storm There may be remote risk of electric shock from lightning 7 Do not use the telephone to report a...

Страница 5: ...has been spilled into the product c If the product has been exposed to rain or water d If the product does not operate normally when the operating instructions are followed Adjust only those controls...

Страница 6: ...ustments or procedures other than those specified herein may result in hazardous radiate exposure To prevent exposure to laser emanations Harmful to Human eyes Do not attempt to disassemble this unit...

Страница 7: ...sible for compliance could void the authority to operate equipment This equipment has been tested and found to comply with the limits for a Class B digital device pursuant to part 15 of the FCC Rules...

Страница 8: ...oper grounding of the mask and supporting structure grounding of the lead in wire to an antenna discharge unit size of grounding conductors location of antenna discharge unit connection to grounding e...

Страница 9: ...grounding system of the building as close to the point of cable entry as practical TV Antenna The TV antenna supplied with any TV Tuner module is intended for Indoor use only Please do not use your TV...

Страница 10: ...ing the Case Cover 16 Removing of Hard Disk Rack 17 Removing of ODD Card Reader Frame 18 Removing the VGA Card 19 Removing the Power Supplier 20 Installing Uninstalling the Hard Disk Drive 21 Installi...

Страница 11: ...ts can become overheated and may become damaged When opening the box of the computer make sure not to damage the box as you may need to keep it and all packing material for future shipping needs Unpac...

Страница 12: ...or one second the unit will enter Suspend mode and if held down for four seconds unit power will switch off 2 HD LED When this LED lights yellow it indicates that the hard disk is being accessed at th...

Страница 13: ...riety of memory cards directly from front panel Rear Panel The features in the rear panel are shown in Figure 2 2 and are described as following Figure 2 2 1 COM1 port turquoise Connect serial RS232 d...

Страница 14: ...stable AC power source CAUTION Before you plug the AC power cord you must first check the voltage toggle switch setting is appropriate for your geographical area 6 Parallel port purple Parallel devic...

Страница 15: ...k A hardware security mechanism which locks the chassis to prevent hardware from being stolen 3 Pad Lock A hardware security mechanism which can lock up the chassis with lock to prevent being opened 4...

Страница 16: ...Please reference to this lable to open the chassis i Lay the unit flat face the rear panel of the unit ii Switch the Chassis Lock to unlock cover position as shown in Figure 3 1 Figure 3 1 Figure 3 2...

Страница 17: ...ain body please disconnect the flat cable and power cord of the hard disk as shown in Figure 4 1 and Figure 4 2 ii Switch the Chassis Lock to HDD unlock position as shown in Figure 4 3 and remove the...

Страница 18: ...ith disengaging metal tab that hook on bottom and move it forward to open it Figure 5 1 ii Before removing ODD Card Reader frame from the main body you must first disconnect the card reader connector...

Страница 19: ...te as indicated by below drawing circle and pull forward you may totally opened the ODD card reader rack as shown in Figure 5 3 Figure 5 3 Removing the VGA Card i Lift up the VGA board shield plate fr...

Страница 20: ...ide as indicted in step 2 to unhook the board from staple Figure 6 2 Perform the above steps in reverse order to install the VGA card Removing the Power Supplier i Pull up the switch to unlock the pow...

Страница 21: ...ing the Hard Disk Drive Only for Office Premium SKU i Hook your hands inward onto the plastic holder as indicated in below drawing step 1 and then lift it upward from the hard disk rack as indicated i...

Страница 22: ...k rack in position by simply placing it back to main frame as shown in Figure 8 3 Figure 8 3 Installing Removing the CPU i Remove the CPU heat sink before removing the CPU To remove the CPU heat sink...

Страница 23: ...he heat sink from motherboard as shown in Figure 9 2 Figure 9 2 iii Orient the CPU with the socket place the CPU on socket it should slide into place without the use of force as shown in Figure 9 3 Sy...

Страница 24: ...t into its latch at the side of the socket as shown in Figure 9 4 above to lock the CPU in position Figure 9 4 v Place the heatsink back to motherboard and screw each side of the heatsink there are 4...

Страница 25: ...intended for the C2D900 to stand securely in the upright position Please assemble it on the chassis as shown in Figure 10 1 and Figure 10 2 Figure 10 1 Figure 10 2 The C2D900 System with the foot stan...

Страница 26: ...tches Power Button Creative Window USB port x 2 IEEE1394 port x 1 Line out jack x 1 Microphone jack x 1 LED Indicators Power On Off Suspend activity indicator HDD activity indicator Back panel USB por...

Страница 27: ...x 1 Power connector Battery socket BIOS Management System BIOS Award BIOS System BIOS compliance ACPI 1 0b S0 S1 S3 S4 S5 APM 1 2 PnP 1 0a SMBIOS 2 3 DMI 2 1 WfM 2 0 USB 2 0 Serial IRQ support for PC...

Страница 28: ...28 Motherboard Placemenet and Specification...

Страница 29: ...t 240pin DDR2 DIMM socket 2 ECC Support N A Type DDR2 533 667 800 Memory Max Memory Support 1 GB for each channel 2GB total dual channel IDE Number NO S ATA Number 4 ports 2 ports Graphics Interface E...

Страница 30: ...RJ45 Modem RJ11 N A 1394 Yes Rear I O Diagnosis LED LAN Activity Follow SAMSYNC default Front USB Port 2x5 2 ports 2 x Pin Header Front Memory Stick N A Front Audio 2x5 Yes Mic in Headphone HD Audio...

Страница 31: ...or LEDs definition PCIe Pin header N A Jumpers CLR_CMOS 1 2 Normal 2 3 Clear CMOS LPC 2x7 for BIOS debug 1 ITP XDP for CPU debug 1 not stuff Energy Lake No WHQL Logo PC2001 Energy Star USB report read...

Отзывы: