Disassembly and Assembly
53
8
Assemble the bracket on the bottom of the touchpad to the two hooks on the Case
front.
•
Attach the touchpad in alignment with the gaps in the up, down, left, and right
directions.
•
Check the lower hooks of touchpad are assembled well to the Case front. If they
are incorrectly connected, the hooks may lift.
Содержание VENUS3-16 EXT
Страница 1: ...www samsung com REPAIR GUIDE NP960XFH English Rev 1 0...
Страница 15: ...Exploded View and Parts List 15 ExplodedViewand Parts List ExplodedView...
Страница 55: ...Disassembly and Assembly 55 11 Remove the touchpad film jig and tape 3 ea...
Страница 60: ...Disassembly and Assembly 60 3 Using a cross head screwdriver fasten the 8 screws on the main PBA...
Страница 61: ...Disassembly and Assembly 61 4 Place the heatsink following 6 screw holes...
Страница 62: ...Disassembly and Assembly 62 5 Using a cross head screwdriver fasten the 6 screws on the heatsink...