
Samsung Electronics
14-8
14-6 Installation
14-6-1 Before Installation
Keep the air conditioner outlet and inlet free from its surroundings.
In case of installation, keep the symmetry and fix it to prevent vibration.
The pipe length shall meet the standard as far as possible.
14-6-2 Installation Procedure
■
Location
Install the product in an area to guarantee the best cooling effect, convenience of piping and electric work, and inexistence of
vibration or wind.
■
Wall Drilling
Drill the wall downward in a diameter of 60 to 65mm.
■
Fixing Indoor Unit & Outdoor Unit
Fix the air conditioner indoor unit securely to the wall. Secure the outdoor unit in a suitable position.
■
Pipe Spooling & Connecting
You shall cut the pipe with a pipe cutter and grind all the burrs of the cut surface.
Pipe expansion may continue until the pipe surface becomes uneven or torn apart.
Be sure to use a torque wrench to tighten pipes or flare nuts.
■
Leak Test
Put an inert gas like nitrogen in the outdoor unit pipe and put soap bubbles or other test liquids on the pipe surface for the
leak test.
■
Drain Hose Connecting
Install the drain hose downward to drain water naturally. Be sure to pour water into the hose to check if it drains well.
■
Testing Drainage
Pure water into the drain pan in the indoor unit, and confirm that the water flows out the drain hose.
■
Electric & Earth Work
Electric and earth work shall meet the "Electric Facility Technology Standard" and the "Internal Wire Regulation" of the Electric
Business Laws.
■
Inspection & Trial Run
Upon completion of the tests, you shall make a trial run while you explain the main functions of the air conditioner to finish the
installation.
D
A
<Torque & Depth>
Outer Diameter(D)
Torque(kgf·cm)
Depth(A)
6.35mm(1/4")
140~170
1.3mm
9.52mm(3/8")
250~280
1.8mm
12.70mm(1/2")
380~420
2.0mm
15.88mm(5/8")
440~480
2.2mm
19.05mm(3/4")
990~1,210
2.2mm
Содержание UH052EAS
Страница 18: ...Samsung Electronics 4 1 4 Disassembly and Reassembly Necessary Tools Item Remark SCREW DRIVER MONKEY SPANNER ...
Страница 29: ...Samsung Electronics 5 1 5 Exploded Views and Parts List 5 1 Indoor Unit DH070 052 EAS ...
Страница 31: ...Samsung Electronics 5 3 Exploded Views and Parts List 27 26 UH070 052 EAS 5 2 Outdoor Unit ...
Страница 33: ...Samsung Electronics 5 5 5 3 Ass y Control Out ...
Страница 56: ...Samsung Electronics 8 2 Outdoor Unit This Document can not be used without Samsung s authorization EMI PCB 8 2 ...
Страница 57: ...9 1 1 Indoor Unit 9 Circuit Descriptions 9 1 PCB Circuit Descriptions Samsung Electronics ...
Страница 58: ...9 1 ...
Страница 59: ...9 1 2 Outdoor Unit 9 1 PCB Circuit Descriptions 9 2 ...
Страница 60: ...Temperature sensor EEV PCB display Communcation Tap motor 4 way valve Samsung Electronics ...
Страница 61: ...MEMO Samsung Electronics ...
Страница 62: ...Samsung Electronics 9 2 Refrigerating Cycle Diagram 9 3 ...
Страница 63: ...Samsung Electronics The red number connecter is not used 10 PCB Diagram 10 1 Indoor PCB 10 1 ...
Страница 95: ...Samsung Electronics 13 Block Diagram 13 1 Indoor Unit 13 1 ...
Страница 98: ...Samsung Electronics 14 2 Pressure Graph UH052EAS 14 2 UH070EAS ...