
Confidential and proprietary-the contents in this service guide subject to change without prior notice
Distribution,
transmission, or infringement of any content or data from this document without Samsung’s written authorization is strictly prohibited.
7. Level 2 Repair
7-5. Assembly
※
Caution
Be care of FPCB damage.
※
Caution
Be care of FPCB and Y-OCTA damage.
※
Caution
Be careful not to damage the PBA.
※
Caution
Be care of scratch and REAR damage
3
Screw 3 Point s of the PBA
(* Torque value : 1.3kgf)
4
Assemble the Bottom REAR in sequence.
1
Assemble PBA on Front.
About 30 degrees will be inserted into the PBA.
2
Battery connect and the other connectors.
(5 Point)