Confidential and proprietary-the contents in this service guide subject to change without prior notice
Distribution, transmission, or infringement of any content or data from this document without Samsung’s written authorization is strictly prohibited.
7. Level 2 Repair
7-5. Assembly
※
Caution
Be care of SPK damage.
※
Caution
Be care of Sub PBA damage.
※
Caution
Please keep the guide line for C to C FPCB
and BLACK, WHITE coaxial Cable.
※
Caution
1) Be care of scratch CAM lens
2) Be care of damage each part.
Attach Motor and Receiver in upper area
1
Attach SPK on Rear Ass
’y.
2
Attach HB PBA and Sub PBA on Front Ass
’y.
3
Attach C to C FPCB and BLACK, WHITE
coaxial cable.
4