SAMSUNG Proprietary-Contents may change without notice
Main Electrical Parts List
2-9
This Document can not be used without Samsung's authorization
9
10
11
①
②
③
④
⑤
1) Lay the LOCKER of LCD PBA on top of LOWER, assemble the LOCKERS.
2) Lock the other LOCKERS as followed pictures of
③
,
④
,
⑤
.
※
Caution
- Assemble the UPPER and FRONT when slide is open.
- Take serious precaution when locking
①
.
- Be careful not the slide F-PCB to be fold.
Identification line to
check FPCB insertion.
1) Screw the 4 point screws.
2) Put the screw cover on top of screws in upper
side.
1) Inserting slide F-PCB and soldering
※
Caution
- Make sure to check the Slide F-PCB insertion
exactly.
- Solder right and left F-PCB not the slide F-PCB
connector to move.
Содержание SGH-S720i
Страница 76: ...www s manuals com ...