Installation
English
26
Ins
tallation
Step-by-step installation
STEP 1
Select a site
Site requirements:
• Solid, level surface without carpeting or flooring that may obstruct ventilation
• Away from direct sunlight
• Adequate room for opening and closing the door
• Away from a heat source
• Room for maintenance and servicing
• Temperature range: between 10 °C and 43 °C
Clearance
See the pictures and table below for space requirements for installation.
C
B
A
Depth “A”
694
Width “B”
595
Overall Height “C”
1853
(unit : mm)
Untitled-7 26
2021-05-25 12:25:13
Содержание RZ32M713ES9
Страница 73: ...Memo Untitled 7 73 2021 05 25 12 25 20...
Страница 74: ...Memo Untitled 7 74 2021 05 25 12 25 20...
Страница 75: ...Memo Untitled 7 75 2021 05 25 12 25 20...