
SAFETY CONCERNS
VIII
© SAMSUNG Electronics Co., Ltd.
Connection of Feeder Cable Connector
Connecting the feeder cable connector is critical process, so the qualified workers
who finished the related education should perform.
Radius of Curvature of Feeder Line
When installing a feeder line, the radius of curvature of the sections where cables
bent should be larger than the allowed radius of curvature. If the radius of
curvature for the feeder line installation is less than the allowed radius of curvature,
it may affect the performance of the system.
Installation
Cautions while Cleaning the Rack
Make sure that worker does not damage installed cables while cleaning the rack.
System Installation and Access
Only authorized workers are allowed to install or access the system.
Do not Work by Yourself
Worker must not work alone in any key process.
Management of Unused Ports
Cover the unused ports (conduit, cable gland, etc.) with waterproof cap (sealing
cap) to prevent infiltration of foreign material such as dust, moisture, or bug.
Caution When Connecting the Optical Cable
When connecting the optical cable, be careful to keep the cutting section of the
connector core away from dust and foreign substances. If the cable is soiled with
foreign substances, do not blow on the cable to remove them. Make sure to
remove the dust or foreign substances in accordance with the cleaning
instructions provided by the connector manufacturer.
Содержание RRH-2WB
Страница 1: ...Ver 2600 00ETB9GAA 2 0 Mobile WiMAX TD LTE RRH 2WB Installation Manual ...
Страница 6: ...INTRODUCTION IV SAMSUNG Electronics Co Ltd This page is intentionally left blank ...
Страница 12: ...SAFETY CONCERNS X SAMSUNG Electronics Co Ltd This page is intentionally left blank ...
Страница 28: ...CHAPTER 1 Before Installation 1 10 SAMSUNG Electronics Co Ltd This page is intentionally left blank ...
Страница 62: ...CHAPTER 2 Installing System 2 34 SAMSUNG Electronics Co Ltd This page is intentionally left blank ...
Страница 94: ...CHAPTER 3 Connecting Cables 3 32 SAMSUNG Electronics Co Ltd This page is intentionally left blank ...
Страница 98: ...ANNEX A Sector Antenna Installation A 4 SAMSUNG Electronics Co Ltd This page is intentionally left blank ...
Страница 108: ...ANNEX B Installing Feeder Cable B 10 SAMSUNG Electronics Co Ltd This page is intentionally left blank ...
Страница 134: ...ANNEX D Cleaning Optic Connector D 10 SAMSUNG Electronics Co Ltd This page is intentionally left blank ...
Страница 138: ...ANNEX F Standard Torque F 2 SAMSUNG Electronics Co Ltd This page is intentionally left blank ...