26 English
Installation instructions
Installation instructions
Step 8. Check the ignition of surface burners and oven burners
Check the operation of all cooktop and oven burners after the range has been
installed and assembled, gas supply lines have been carefully checked for leaks,
and electrical power cord has been plugged in.
All surface and oven burners have electronic ignition.
To turn on a surface burner:
1.
Push in and turn the control knob for
that surface burner to the LITE position.
The “clicking” sound indicates the
electronic ignition system is operating
properly. The burner will light in about
4 seconds, after the air has been purged
from the supply line.
2.
After the burner lights, turn the control
knob to the desired setting. The
“clicking” sound will stop and the flame
height will change from Max. to Min.
during turning the control knob.
3.
Repeat steps 1 and 2 to check the
operation of each surface burner
insuccession.
NOTE
Place food in the oven after preheating
if the recipe calls for it. Preheating is
important for good baking results. After
the oven has reached the desired cooking
temperature, it will beep 6 times.
Step 7. Assemble the surface burners
CAUTION
Do not operate the surface burners without all burner parts in place.
1.
Position surface burner heads on top of
the surface burner manifolds as shown
at right. The electrodes will fit into the
slot in the bottom of the heads. Make
sure the surface burner heads are flat
and parallel with the cooktop.
2.
Place the matching size caps on top of
each surface burner head.
3.
Place the left, center, and right surface
burner grates on the cooktop. The edges
of the grates should match up with the
edges of the cooktop.
Install_NX58R4311SS_AA_DG68-01153A-02_EN+MES+CFR.indb 26
2020-06-16 �� 8:30:19
Содержание NX58 4311S Series
Страница 31: ...Memo Install_NX58R4311SS_AA_DG68 01153A 02_EN MES CFR indb 31 2020 06 16 8 30 23 ...
Страница 63: ...Notas Install_NX58R4311SS_AA_DG68 01153A 02_EN MES CFR indb 31 2020 06 16 8 30 40 ...
Страница 95: ...Notes Install_NX58R4311SS_AA_DG68 01153A 02_EN MES CFR indb 31 2020 06 16 8 30 56 ...