36
English
ins
tallation
CAUTION
• If changing the pipe direction from left to right, do not
drastically bent it but slowly turn it in the opposite
direction as shown. Otherwise, the pipe may be
damaged in the process.
2.
Drill the hole.
CAUTION
• Be sure to drill only one hole.
• Make sure that the hole slants downwards so that the
drain hose slants downwards to drain water well.
Step 1.4 Taping the pipes, cables, and
drain hose
1.
Wrap foam insulation on parts without
insulation on the ends of the refrigerant
pipes, as shown in the figure. This
wrapping minimises condensation problem.
2.
Wind the refrigerant pipes, power cable,
communication cable and drain hose with
vinyl tape to make a pipe bundle.
<Possible directions of the pipe bundle>
Left
Right
Rear right or left
Bottom right
<Minimum distances between the hole
and the installation plate>
Wall
Drain hose
Indoor unit
<The hole slants downwards>
Insulation
Refrigerant pipes
Refrigerant pipes
(assembly pipe)
Installation plate
Vinyl tape
Power and communication
cables (assembly cable)
Drain hose
Pipe bundle hole
Pipe bundle hole
(Unit : mm)
Model
A
B
C
D
09/12
36
120
81
36
Pipe bundle hole: Ø 65 mm
<Minimum distances between the hole
and the installation plate>
(Unit : mm)
Model
A
B
C
D
18/24
33
110
110
33
Pipe bundle hole: Ø 65 mm