Confidential
Chapter 2 Installing System
MT6402-48A Installation Manual v1.0
31
Copyright © 2019, All Rights Reserved.
the following table.
Table 8. Tools for Marking
Category
Description
Part Marking
paper
1
EA
Working Tools
Tape Measure
Permanent Maker
Level
To mount the system on a wall, perform the leveling test (refer System Leveling)
to check the positions that are marked to be horizontal or vertical before drilling. If
the result shows they are not horizontal or vertical, modify the marking positions.
When the position is determined for placing the system, place the system on that
position and then mark the positions where anchor bolts will be fixed. This will
reduce the marking error.