Samsung MIM-E03A Скачать руководство пользователя страница 14

26

27

EN

G

LIS

H

Test operation

Picture 

Explanation 

For checking sensor

Mode

Cancel

1.  Commissioning mode

f

f

For active

 - Commissioning mode can be implemented regardless 

of communication error without outdoor installation.

 - The mode will be activated after change to DIP#5 “ON” 

or resetting power

 - Allowed by Keys input for Heating/How water over for 

3sec

f

f

For inactive

 - Cancel key input over for 3 sec. basic functions of each 

keys are not available for commissioning (Inactive : all 
heating loads is restored to default)

For checking sensor

Mode

Cancel

2.  Installation / Checks 

 - Key #1 ~ #8 : Pump, Backup Heater 1st/2nd control, 

Booster Heater, Backup Boiler, 3-way valve(for 2-way 
valve, how water 

 heating/cooling), 2-way valve 

#1(Thermostat #1 for Zone #1), 2-way valve #2 
(Thermostat #2 for Zone #2) 

 - Icons displayed and contact output will be provided 

when button input by wired remote controller (3way 
valve for how water (key#6) come to default condition 
(room direction) other keys come to default (OFF)

 - If the input of pump (#1) not performed than backup 

heater (#2, #3), “Not available” signal will be pop up.

 - 3way valve (key#6) will not go into “ON” simultaneously 

with zone control and 2 way valve for cooling. While 
input of “ON” for something be progressed, if another 
input signal be putted, “Not available” signal will be pop 
up. Prohibited for getting to “ON” between 2 way valves  
(Zone #1 = 2-1, Zone #2 = 2-2) 

 - Each key can be allowed to change in condition of 

initial default (one time), if users want to do re-input 
in case of wrong operation, all loads contacts will be 
restored to default (FF) and “Not available” will be 
displayed over one time input.

 - The key of “VIEW” always be allowed for input. Every 

time the key be pushed, values of Water In, Water Out1 
(Heat Exchanger Out), Water Out2 (Backup Heater 
Out), Tank, Room will be displayed in order. If no input 
additionally for 5 sec, it will be restored to previous 
condition. 

Setting option switches and function of keys

•  Code 40

✴✴

 : User’s options for heating devices including internal backup heater and external boiler

   

401

 : Space/DHW heating priority and control variables

   

402

 : Backup/Booster heater priority and control variables

   

403

 : Additional backup boiler operating variables

•  Code 50

✴✴

 : User’s options for extra functions

   

501

 : New target temperatures of each mode by “Outgoing” hot key of remote controller

   

5021 : Temperature difference between before & after values in “Economic” DHW mode

   

503

 : Time-division multi(TDM) variables for combining operation b/w A2A and A2W

Field Setting Value

Main Menu & 

Code

Sub Menu Function

Description

Sub Code Default

Min

Max

Step

Unit

Heating Code 

40

✴✴

Heat Pump

Heating/DHW Priority

✴✴

11

0(DHW)

0

1(Heating)

-

-

Outdoor Temp for Priority

✴✴

12

0

-15

20

1

˚C

Heating Off

✴✴

13

25

14

35

1

˚C

Overshoot

✴✴

14

2

1

4

1

˚C

Backup Heater

Application

✴✴

21

1(On)

0(Off)

1

-

-

BUH/BSH Priority

✴✴

22

0(Both)

0

2(BSH)

1

-

For back-up use only

✴✴

23

1(On)

0(Off)

1

-

-

Threshold Temp

✴✴

24

0

-15

35

1

˚C

Backup Boiler

Application

✴✴

31

0(No)

0

1(Yes)

-

-

Boiler Priority

✴✴

32

0(Off)

0

1(On)

-

-

Threshold Temp

✴✴

33

-15

-20

5

1

˚C

Others Code 

50

✴✴

Outing

Water Out Temp for Cooling

✴✴

11

25

5

25

1

˚C

Room Temp for Cooling

✴✴

12

30

18

30

1

˚C

Water Out Temp for Heating

✴✴

13

25

15

55

1

˚C

Room Temp for Heating

✴✴

14

16

16

30

1

˚C

Auto Cooling WL1 Temp

✴✴

15

25

5

25

1

˚C

Auto Cooling WL2 Temp

✴✴

16

25

5

25

1

˚C

Auto Heating WL1 Temp

✴✴

17

15

15

55

1

˚C

Auto Heating WL2 Temp

✴✴

18

15

15

55

1

˚C

Target Tank Temp

✴✴

19

30

30

70

1

˚C

DHW Saving Mode

Temp Difference

✴✴

21

5

0

40

1

˚C

TDM Variable

A2A Max Operation Time

✴✴

31

30

5

60

5

min

A2W Min Operation Time

✴✴

32

3

0

10

1

min

Power Peak Control

Application

✴✴

41

0(No)

0

1(Yes)

-

-

Select forced off parts

✴✴

42

1

0

3

-

-

Using input voltage

✴✴

43

1(High)

0(Low)

1

-

-

•  Code 5042

[D-00]

Compressor

Back up heater

Booster heater

0 (Default)

Forced off

Forced off

Forced off

1

Forced off

Forced off

Permitted

2

Forced off

Permitted

Forced off

3

Forced off

Permitted

Permitted

Содержание MIM-E03A

Страница 1: ...iant with RoHS MIM E03 SAMSUNG CONTROL UNIT installation manual imagine the possibilities ThankyouforpurchasingthisSamsungproduct To receive more complete service please register your product at www samsung com register E S F I P D DB98 00000A 1 ...

Страница 2: ...ach of children f f Do not attempt to repair move alter or reinstall the unit by unauthorized personnel these operations may cause product damage electric shocks and fires f f Do not place containers with liquids or other objects on the unit f f All the materials used for the manufacture and packaging of the air to water heat pump are recyclable f f The packing materials must be disposed of in acc...

Страница 3: ...s are stored f f Choose a specific wall which can withstand the weight of unit and an outside force Mounting the unit Procedure Remark 1 Remove 2 bolts from the unit Bolt 2 Open the top cover and install 4 screws on the wall 3 Close the top cover and install 2 bolts again into the unit Product specifications Item Description MIM E03A Wired remote controller Temperature sensor Thermistor 1EA Remote...

Страница 4: ...te controller cable through the upper portion Remote controller cable Wood screw B 4 Connect the remote controller cable to the terminal block TB6 No polarity ToTB62 No 5 and 6 on the FTC unit Installing the unit Installing the remote controller Connecting the wired remote controller cable to FTC f f Connect the wired remote controller cable to 5 and 6 on the terminal block TB62 on the FTC control...

Страница 5: ...use Heater Water Pump Valve Wired RMC 1Ø 220 240V 50Hz 1 5 3 L 10m 10 2 5 3 10m L 10 Use Booster Heater 3kw 4 0 3 L 10m 30 6 0 3 10m L 30 Connecting the communication wire f f Connect outdoor unit s F1 F2 with control kit s F1 F2 inTB C by 2 core cable Outdoor Unit at Control Plate Control Kit Wiring works Overall schematics Flow S W Outdoor Unit Temp Sensor Solar Main Power Relay Pump Booster Hea...

Страница 6: ... 230V MAX 20A Wiring works Communication with wired remote controller Wired Remote Controller Connecting the wired remote controller 1 Connect V1 V2 F3 F4 of control kit with V1 V2 F3 F4 of wired remote controller f f You can connect maximum 2 set of wired remote controller f f In case of 2 sets for wired remote controller installation master slave settings shall be implemented Temperature sensor ...

Страница 7: ...nnection load Signal for turning Backup Boiler on Driving for Relay or Magnetic Contactor Output AC 230V MAX 0 5A Wiring works Backup heater Magnetic ContactorWire Connecting magnetic contactor for backup heater Not Directly Connect Heater 1 Connect Magnetic contactor wire with pin 1 2 3 inTB B f f If control kit turns on the 1st step of backup heater pin 1 pin 2 will output AC230V f f If control ...

Страница 8: ... line 10 Output turning on Power Normal Closed L line Connection load Direct connect 2way valves under 0 5A Output AC 230V MAX 0 5A 120W Wiring works Water pump Water Pump Connecting water pump 1 Directly connect water circulation pump with pin 5 6 inTB B f f If control kit orders turning water pump on pin 5 pin 6 will output AC230V Maximum Power This port can supply power for small medium sized w...

Страница 9: ...Condition for operation NOT Define Wiring works Example of valve connection f f 2 pole L1 N type L1 port ofValve is connected to 10 N port ofValve is connected to 7 If L1 N ports ofValve get power water can NOT flow to DHW tank If L1 N ports ofValve don t get power water can flow to DHW tank f f 3 pole L L1 N type L port ofValve is connected to 8 L1 port ofValve is connected to 10 N port ofValve i...

Страница 10: ...120W Condition for operation NOT Define Wiring works Example of valve connection f f 2 pole L1 N type L1 port ofValve is connected to 13 N port ofValve is connected to 11 If L1 N ports ofValve get power water can flow to Zone1 If L1 N ports ofValve don t get power water can NOT flow to Zone1 f f 3 pole L L1 N type L port ofValve is connected to 12 L1 port ofValve is connected to 13 N port ofValve ...

Страница 11: ...in 22 detects L line the valve for Zone1 will open outdoor unit will operate for heating mode Pin 23 detects L line the valve for Zone2 will open outdoor unit will operate for cooling mode Pin 24 detects L line the valve for Zone2 will open outdoor unit will operate for heating mode Wiring works Example of valve connection f f 2 pole L1 N type L1 port ofValve is connected to 17 N port ofValve is c...

Страница 12: ...non detection For Commissioning Emergency S W 6 Normal operation Emergency S W 7 No use No use S W 8 No use No use Wiring works Solar Pump Solar Panel Connecting solar pump 1 Connect Solar pump power line with pin 25 26 inTB B f f If pin 25 26 get AC230V Control Kit will aware Solar Panel supply heat to DHW tank Maximum Consumption Power Each port use under 10mA NOTE Specification table Part Speci...

Страница 13: ...ank 0 1 Room Zone 1 72 1 Room 0 1 Zone 2 73 1 Room 0 1 Setting option switches and function of keys Field setting mode Field SettingValue FSV Table Code 10 Upper and lower temperature limits of each operation mode of wired remote controller Heating Water Out Room Cooling Water Out Room DHW Tank Code 20 Water law design and external room thermostat Heating 2WL s for floor FCU Cooling 2WL s for floo...

Страница 14: ...der If no input additionally for 5 sec it will be restored to previous condition Setting option switches and function of keys Code 40 User s options for heating devices including internal backup heater and external boiler 401 Space DHW heating priority and control variables 402 Backup Booster heater priority and control variables 403 Additional backup boiler operating variables Code 50 User s opti...

Страница 15: ...ode shall be possible regardless of outdoor communication error It is available after change DIP 5 and DIP 6 into ON and re set mode Enable disable modes allowed for heating and how water mode Heater mode will be available after each ON mode and disable mode can be ended by each OFF input available for Simultaneous Operation Depending on the condition of heater or tank un installation using heater...

Страница 16: ...page carefully and implement visual inspections of the whole system Possible causes Actions Heating or cooling performance are not good Check the temperature adjustment in the controller Check if the water is filled in the system fully Check the water flow rate Loud noise from water pump Check air purge valve Make it open and close Check if the water is filled in the system fully Check if strainer...

Отзывы: