
16
AA
<The machine shall be installed on the ground or on the high platform>
X
f
As shown in Figure 1, to ensure the shadow part is on the bearing surface without suspension.
X
f
As shown in Figure 1, the four installation footings shall be firmly fastened on the base platform by the bolts (preparing
four sets of M12 bolts with fitful nuts and washer which are used on site)
X
f
In order to reduce the vibration of the noisemeter, the vibration absorber (offer on site) shall be used between the
contact of machine and base platform.
X
f
It is optimal that anchor bolt is 20mm above the surface. (See Figure 2)
X
f
Please ensure the shadow part in Figure 1 is really installed on the bearing surface without any suspension.
X
f
he ground base that is larger than the standing leg of the air-conditioner (90mm in width and 410mm in length) shall
be used to support the air-conditioner (See Figure 1), and the rubber mat shall be fully placed on the whole bearing
surface.
X
f
The base platform shall be at least 150mm above the ground.
•
When the grounding pipe comes out from the below, please reserve the place for the connection pipe.
•
The installation mode mentioned above shall ensure that the shadow part in Figure 1 is really on the installation
surface.
Caution
Base construction and installation
of the outdoor unit
The base of the outdoor unit and the position of foundation bolts
620
328 410
86
695
↔
>90
>90
>100
↕
20mm
Figure 1
Figure 2
Ground plan
Position of the foundation bolts
(Ø12.0 Hole 4Points)
Bearing surface
Unit: mm
•
Please firstly ensure the strength and levelness of the platform, ground and the support so as to lower the
noise and vibration for fear of human injuries.
•
The hanging mount on the wall is not recommended due to the heavy machine.
•
If the hanging mount on the wall is required, please entrust the distributor to do so and strictly following
the following requirements. The improper installation shall lead to the fall of the machine as well as human
injuries.
Caution
Содержание DVM S ECO AM XMDG Series
Страница 1: ......