Engl
ish
Installation
English
26
STEP 5
Power on (for gas models)
Make sure all gas connections, the exhaust line, and all wiring is connected correctly. Then, plug the
power cord into a power source and check the dryer’s installation and operation using the final checklist in
section below.
STEP 6
Final check
When installation is complete, confirm that:
• The dryer is plugged into an electrical outlet and grounded properly.
• The exhaust ductwork is connected, and the joints are taped.
• You have used rigid or stiff-walled flexible metal duct material, not plastic flexible duct.
• The dryer is level and is sitting firmly on the floor.
• The dryer starts, runs, heats, and shuts off properly.
For gas models:
• The gas is supplied properly with no leaks.
CAUTION
The burner may not ignite initially due to air in the gas line. Allowing your dryer to operate on a heat setting
will purge the line. If the gas does not ignite within 5 minutes, turn your dryer off and wait 5 minutes. Be
sure the gas supply to your dryer has been turned on. To confirm gas ignition, check the exhaust for heat.
Untitled-3 26
2022-04-27 4:03:25
Содержание DVE50B5100 Series
Страница 1: ...Dryer Usermanual DVE G 50B5100 Untitled 3 1 2022 04 27 4 03 22 ...
Страница 50: ...Memo Untitled 3 50 2022 04 27 4 03 29 ...
Страница 51: ...Memo Untitled 3 51 2022 04 27 4 03 29 ...