Part 1: Site Survey and Overview of DECT Systems
7
y
Cabling details: a specification of cables already present on the site and a list of new
cabling required, including the distance between the Base Station and IWU card for existing
and new cabling.
y
Copies of the maps of the site with the position of Base Stations and cell boundaries clearly
marked.
y
A list of possible configurations to help the customer decide exactly what is required.
y
A specification of where Base Stations should be placed. This can be marked on the survey
map, but additional information such as height and fixing instructions should be included
where appropriate.
y
A specification of the areas that will be covered by the Base Stations and areas that may
cause problems. This can be useful when testing the system. The theoretical maximum
number of overlapping cells is 10, if all time slots and frequencies are used. If not all time
slots and frequencies are used, this value is higher, although this is unlikely to be the case
in practical situations. For a large site where a thorough survey has been impossible, it may
be prudent to add 10–20% more Base Stations to requirements to allow for unforeseen
problems.
Содержание DECT 1500
Страница 1: ...SAMSUNG DECT 500 1500 Product Name Installation and Programming Product Name Manual ...
Страница 14: ...Part 1 Site Survey and Overview of DECT Systems 9 Example Cell Planning Results Survey Map of the 1st Floor ...
Страница 15: ...Part 1 Site Survey and Overview of DECT Systems 10 Survey Map of the 2nd Floor ...
Страница 16: ...Part 1 Site Survey and Overview of DECT Systems 11 Survey Map of the 3rd Floor ...
Страница 46: ...41 Appendix 1 Deployment Flowchart ...
Страница 48: ...Samsung Telecoms U K Limited Brookside Business Park Greengate Middleton Manchester M24 1GS ...