
E-
12
EEV Kit Installation
Preparing for Installation
1
Check dimension and installation location.
2
Check installation place.
By using a pattern sheet, check required installation space.
Concrete
Suspension bolt(3/8" or M10)-field supply
Hole in anchor
Hole in plug
Insert
���
���
���
���
���
���
���
���
���
��
��
��
��
���
���
��
��
��
���
���
���
���
��
���
��
���
���
��
��
��
���
���
450mm X 200mm or more
(Maintenance Hole)
Maintenance hole must be located on
the ceiling.
Indoor unit pipe
connection
Outdoor unit pipe
connection
Drain hole
Required maintenance
space
Required
maintenance space
Required maintenance
space
Required
maintenance space
Unit : mm
AVXWH@@_IM_E_24119-1.indd 12
2006-01-10 ¿ÀÈÄ 2:55:25
Содержание AVXWH series
Страница 29: ...E 29 ENGLISH Memo ...
Страница 30: ......