
Operating Instructions and Installation
3-12
Samsung Electronics
3-2-2(i) Refrigerant Adjustment
3-2-2(j) Flare unt fixing torque
Class
At installation
At service
Outter diameter
ø 6.35 (9000Btu, 12000Btu)
(Liquid Side)
ø 9.52 (9000Btu)
(Gas Side)
ø 12.7 (12000Btu)
(Gas Side)
160
300
500
200
350
550
Fixing Torque Final Torque
Torque (kg-cm)
Connection
Pipe Length
5m Max.
5~10m
Air-Purge
Method
Refer to the
detailed Air-Purge
Procedure
Refrigerant
Adjustment
Unnecessary
Add 10g of refrigerant
(R-22) for every 1m.
Air-Purge
Method
Purge air using a
vaccum pump
or an additional
refrigerant cylinder.
Refrigerant
Quantity
refer to
specification sheet
Add 10g of refrigerant
(R-22) for every 1m.
20
25
30
35
40
45
32.4
30.6
28.8
27.0
24.0
21.5
6.5
6
5.5
5
4.5
4
3.5
Outdoor inlet air DB temp.(˚C)
Содержание AQV12F2VE
Страница 36: ...Samsung Electronics 6 1 6 Exploded Views and Parts List 6 1 Indoor Unit...
Страница 38: ...Samsung Electronics 6 3 6 2 Outdoor Unit 26 27 24 25...
Страница 42: ...6 7 Samsung Electronics 6 3 3 Ass y control Outdoor unit DB93 00022A UQV12A0TE Exploded Views and Parts List...
Страница 46: ...Samsung Electronics 7 3 7 2 ASS Y PCB OUT DB93 10604A UQV12A0TE UQV09A0TE...
Страница 49: ...Samsung Electronics 8 1 8 Wiring Diagrams 8 1 Indoor Unit...
Страница 50: ...Samsung Electronics 8 2 8 2 Outdoor Unit UQV12A0TE...