
22
A
Step 1
Review all the following elements in the installation:
◆
Installation site strength
◆
Piping connection tightness to detect any gas leakage
◆
Connection wiring
◆
Heat-resistant insulation of the piping
◆
Drainage
◆
Earthing wire connection
Step 2
IMPORTANT!
Before selecting switch turn off the system power supply
Step 3
Follow of indication reported into table below for indoor unit addressing
Step 4
Turn on the system power supply and waiting for 60 seconds after estabilishing communication
between outdoor and indoor units.
During this phase, the left display of outdoor unit display PCB “DIS01” will count fom 00--01--02 to 15.
Estabilished communication the left display will count sequentially:
00--communication with indoor unit A;
01--communication with indoor unit B;
02--communication with indoor unit C;
03--communication with indoor unit D;
※
In case of Manual address mode,you can do pipe check operation for check whether you connect the pipes correctly or not.
But you need set indoor address switch yourselves.
Switch
Indoor unit
address
Display of the external unit
SW 02
Manual
addressing
Move down the
switch n°1
- Move dipswitch n°1 of “SW02 - outdoor
unit display PCB” down (AJ
777
JNL
777
);
- For assigning new indoor unit address,
refer to page 23~25.
(AJ
777
JNN
777
/AJ
777
JNA
777
)
Advise control we are going to proceeed with manual addressing as follow:
Setting an indoor unit address and installation option