![Samsung AC NX S C Series Скачать руководство пользователя страница 29](http://html.mh-extra.com/html/samsung/ac-nx-s-c-series/ac-nx-s-c-series_installation-manual_336654029.webp)
AA
29
English
ENGLISH
Testing operations
1) Check the power supply between the outdoor unit and the auxiliary circuit breaker.
f
1 phase power supply : L1, L2
f
3 phase power supply: L1, L2,L3,N
2) Check the indoor unit.
1) Check that you have connected the power and communication cables correctly. (If the power cable
and communication cables one mixed up or connected incorrectly, the PCB will be damaged.)
2) Check the thermistor sensor, drain pump/hose, and display are connected correctly.
3)
KEY buttons are on Main PBA of Outdoor Unit.
3)
Press K2 on the outdoor unit PCB to run the test mode and stop.
Key
Push type
Mode
Display
SEG1
SEG2
SEG3
SEG4
K2
Short
1st
Cooling test
2nd
Stop
4) How to reset the power supply of the outdoor unit :
f
Press [K3] button over 1 sec to reset the power supply of the outdoor unit .
Display
K
EY
Display
K
EY
∗∗
100/120/140/160
∗∗
∗∗
052/071/090
∗∗
Содержание AC NX S C Series
Страница 32: ......