6-2
EB 8075 EN
Start-up
Before start-up or putting the valve back into
service, make sure the following conditions
are met:
− The valve is properly installed into the
pipeline (see the 'Installation' section).
− The leak and function tests have been
completed successfully (see the 'Testing
the installed valve' section).
− The prevailing conditions in the plant
section concerned meet the valve sizing
requirements (see information under
'Intended use' in the 'Safety instructions
and measures' section).
Start-up/putting the valve back into opera-
tion
1. Allow the valve to cool down or warm up
to reach ambient temperature before
start-up when the ambient temperature
and process medium temperature differ
greatly or the medium properties require
such a measure.
2.
Slowly open the shut-off valves in the
pipeline. Slowly opening these valves
prevents a sudden surge in pressure and
high flow velocities which can damage
the valve.
3. Check the valve to ensure it functions
properly.
Содержание EB 8075 EN
Страница 28: ...3 14 EB 8075 EN...
Страница 34: ...4 6 EB 8075 EN Shipment and on site transport...
Страница 58: ...8 4 EB 8075 EN...
Страница 60: ...9 2 EB 8075 EN...
Страница 66: ...12 2 EB 8075 EN...
Страница 68: ...13 2 EB 8075 EN...
Страница 70: ...14 2 EB 8075 EN...
Страница 77: ......
Страница 78: ......
Страница 79: ......