10-2
EB 2172 EN
Decommissioning
To decommission the regulator for service
work or disassembly, proceed as follows:
1. Close the shut-off valve (1 and 6) on the
downstream and upstream side of the
regulator.
2. Close any shut-off valve installed on the
downstream and upstream side of the
sensor if a thermowell is not used.
3. Completely drain the pipelines and regu-
lator.
4.
Depressurize the plant.
5. If necessary, allow the pipeline and reg-
ulator components to cool down or warm
up to the ambient temperature.