![Samson 43-1 Скачать руководство пользователя страница 25](http://html1.mh-extra.com/html/samson/43-1/43-1_mounting-and-operating-instructions_805777025.webp)
EB 2171 EN
25
Mounting and assembly
5 Mounting and assembly
Valve and control thermostat can be assem-
bled before or after the valve has been in-
stalled in the pipeline. We recommend first
installing the valve without the control ther-
mostat into the pipeline.
5.1 Preparation for installation
Proceed as follows:
Î
Flush the pipelines.
The plant operator is responsible for clean-
ing the pipelines in the plant.
Any impurities carried along by the process
medium may impair the proper functioning
of the regulator. We recommend installing a
strainer (e.g. SAMSON Type 1 NI) upstream
of the pressure reducing valve (see sec-
Î
Check the valve and control thermostat to
make sure that they are clean and not
damaged.
Î
Check to make sure that the type desig-
nation, valve size, material, pressure rat-
ing and temperature range of the valve
and control thermostat match the plant
conditions (size and pressure rating of
the pipeline, medium temperature etc.).
Î
Check any mounted thermometers to
make sure they function.
Note
Note
6 Mounting and start-up
Risk of overheating due to excessive ambient
temperatures or insufficient heat dissipation
when components are insulated.
−
Do not include the regulator in the insula-
tion of the pipeline.
Risk of impaired functioning of the regulator
and leakage at the joint due to installation
under tension.
−
Bolt the regulator to the pipeline free of
stress.
−
If necessary, support the pipelines near to
the connections.
−
Do not attach supports directly to the valve
or control thermostat.
NOTICE
!
NOTICE
!
NOTICE
!