
6-2
EB 8222-1 EN
Start-up
Start-up/putting the device back into oper-
ation
1. Allow the valve to cool down or warm up
to reach ambient temperature before
start-up when the ambient temperature
and process medium temperature differ
greatly or the medium properties require
such a measure.
2.
Slowly open the shut-off valves in the
pipeline. Slowly opening these valves
prevents a sudden surge in pressure and
high flow velocities which can damage
the valve.
3. Check the valve to ensure it functions
properly.
Содержание 3310
Страница 12: ...1 8 EB 8222 1 EN Safety instructions and measures...
Страница 38: ...5 12 EB 8222 1 EN...
Страница 42: ...7 2 EB 8222 1 EN...
Страница 46: ...8 4 EB 8222 1 EN...
Страница 64: ...12 2 EB 8222 1 EN...
Страница 66: ...13 2 EB 8222 1 EN...
Страница 78: ...15 4 EB 8222 1 EN...
Страница 79: ......