![Samson 33-1 Скачать руководство пользователя страница 23](http://html1.mh-extra.com/html/samson/33-1/33-1_mounting-and-operating-instructions_3829730023.webp)
EB 2551-1 EN
4-3
Shipment and on-site transport
4.3.2 Lifting the regulator
To install a large regulator into the pipeline,
use lifting equipment (e.g. crane or forklift)
to lift it.
Lifting instructions
Î
Use a hook with safety latch to secure the
slings from slipping during lifting and
transporting (see Fig. 4-1).
Î
Secure slings against slipping.
Î
Make sure the slings can be removed af-
ter installation.
Î
Prevent the regulator from tilting or tip-
ping.
Î
Do not leave loads suspended when in-
terrupting work for longer periods of
time.
Î
Make sure that the axis of the pipeline is
always horizontal during lifting and the
axis of the plug stem is always vertical.
Lifting
1.
Attach one sling to the flange of the
body and to the rigging equipment (e.g.
hook) of the crane or forklift (see
2. Carefully lift the regulator. Check wheth-
er the lifting equipment and accessories
can bear the weight.
3. Move the regulator at an even pace to
the site of installation.
4. Install the regulator into the pipeline (see
the 'Installation' section).
5. After installation in the pipeline, check
whether the regulator flanges are bolted
tight.
6. Remove slings.
Fig. 4-1:
Schematic drawing of lifting points on
the regulator
Содержание 33-1
Страница 12: ...2 2 EB 2551 1 EN Markings on the device...
Страница 19: ...EB 2551 1 EN 3 7 Design and principle of operation Dimensional drawings L H D H2 Fig 3 3 Dimensions...
Страница 20: ...3 8 EB 2551 1 EN Design and principle of operation...
Страница 32: ...5 8 EB 2551 1 EN Mounting and assembly...
Страница 36: ...7 2 EB 2551 1 EN Operation...
Страница 46: ...11 2 EB 2551 1 EN Removal...
Страница 48: ...12 2 EB 2551 1 EN Repairs...
Страница 50: ...13 2 EB 2551 1 EN...
Страница 55: ......