6-2
EB 8046 EN
Start-up
'Intended use' in the 'Safety instructions
and measures' section).
Start-up/putting the valve back into opera
-
tion
1. Allow the valve to cool down or warm up
to reach ambient temperature before
start-up when the ambient temperature
and process medium temperature differ
greatly or the medium properties require
such a measure.
2. Slowly open the shut-off valves in the
pipeline. Slowly opening these valves
prevents a sudden surge in pressure and
high flow velocities which can damage
the valve.
3. Check the valve to ensure it functions
properly.
Содержание 3246
Страница 14: ...1 10 EB 8046 EN...
Страница 28: ...3 12 EB 8046 EN...
Страница 80: ...12 2 EB 8046 EN...
Страница 82: ...13 2 EB 8046 EN...
Страница 84: ...14 2 EB 8046 EN...
Страница 87: ...EB 8046 EN 14 5...
Страница 88: ...14 6 EB 8046 EN...
Страница 91: ...EB 8046 EN 15 3 9 10 8 16 11 19 92 21 17 4 5 87 86 12 11 70 1 14 13 85 83 84 81 88 26 82 3 80 81 15...
Страница 93: ......
Страница 94: ......
Страница 95: ......