6-2
EB 3132-3 EN
Start-up
6.1
Start-up and putting the
device back into operation
1.
Depending on the field of application,
allow the regulator to cool down or
warm up to reach ambient temperature
before start up.
2. Slowly open the shut-off valves in the
pipeline. Slowly opening these valves
prevents a sudden surge in pressure and
high flow velocities which can damage
the valve.
3.
Check the regulator to ensure it functions
properly.
Before starting up the plant, make sure the
following conditions are met:
Î
The control line is connected correctly.
6.2
Starting up the plant
1. Open the shut-off valves slowly prefera-
bly starting from the upstream pressure
side. Afterwards, open all the valves on
the consumer side (downstream of the
regulator).
2. Fill the plant
slowly
with the process me-
dium. Avoid pressure surges.
3. Make sure that the pressure rises simulta-
neously upstream and downstream of the
regulator to avoid damaging the balanc-
ing plug.
On filling the plant, make sure the restriction
(1.2) is open by turning the set point screw
(12) counterclockwise (
) as far as it will go.
4. Put the regulator into operation by
slow
-
ly
opening the shut-off valves preferably
starting from the return flow pipe.
5.
Check the adjusted temperature set point
at the thermometer installed near the
temperature sensor.
Note
Содержание 2479
Страница 62: ...11 2 EB 3132 3 EN...
Страница 64: ...12 2 EB 3132 3 EN...
Страница 66: ...13 2 EB 3132 3 EN...
Страница 69: ...EB 3132 3 EN 14 3 Certificates...
Страница 70: ...14 4 EB 3132 3 EN...
Страница 73: ...EB 3132 3 EN 15 3 Annex 185 182 186 30 4 31 2 129 7 54 188 134 27 220 110 Fig 15 2 Type 2479 Valve DN 32 to 50...
Страница 75: ...EB 3132 3 EN...
Страница 76: ...EB 3132 3 EN...
Страница 77: ...EB 3132 3 EN...