3-7. Inverter Operation
To operate the power inverter, use the ON / OFF switch on the Front panel to
turn the power on. Then the power inverter is ready to deliver AC power to
your loads. If several loads are to be used, turn them on separately after the
inverter is “ON” in order to prevent activation of Over Load Protection “OLP”
due to combined starting surge power.
3-7-1. Set the power switch to “ON” position and the buzzer will send out
“Beep” sounds at the moment. Then the inverter will make self-
diagnosis, and the LED’s indicators will change various colors. Finally
the buzzer will “Beep” again and the Input Level and Status LED
indicators will turn to “Green” color, then the inverter starts to work
successfully.
3-7-2. Set the power switch to the OFF position, then the inverter stops and
all the lights go Off.
3-7-3. Set the power inverter switch to ON position and turn the test load On.
The inverter should supply power to the load. If you plan to accurately
measure the true output r.m.s. voltage of the inverter, a meter such as
FLUKE 45 BECKMAN 4410 or TRIPLETT 4200 must be used.