background image

 

 

SAM Leisure Coventry England 

Tel +44 (0)24 7646 1234 Fax +44 (0)24 7646 4433 

[email protected]

  

www.samleisure.co.uk

 

 
 

 

Fixings Checklist 

Bag 1) Base Frame Assembly (D) to Legs (E) 

8 Screws Hex.din 933 M-8x20 

- To anchor central bar to external frame bars 

8 Nuts M-8 

 

8 Washers 0 25x2 8mm 
 
16 Screws Hex.din 933 M-10x25 - 

To anchor leg to base frame 

16 Nuts M-10 
16 Washers 30x3 
 

Bag 2) Apron Assembly (F)

 

16 Screws 7976 R/CH6’ 3x40 - 

To attach aprons to legs

 

16 Washers 30x3 
 
8 Screws 7976 R/CH 0 6’ 3x13 - 

To anchor bracket support

 

16 Short Screws 
 

Bag 3) Slate Assembly (C)

 

14 Screw Thread Bar M-8x60 ZN - 

To anchor slate to base frame

 

14 Nuts 22x8 ZN 
14 Washers 30x3 
14 Nuts M-8 
 
8 Screws M-8x90 - 

To level slate 

20 Screws M-8x30 
22 Levelling Caps 22x6 
 

Bag 4) Rail apron Assembly & Ball Storage Rack (B)

 

24 Screws Alom/04x13 – 

To attach vertical corner to apron

 

2 Screws M-6 – 

Storage Rack

 

18 Screws 06’ 3x16 – 

To anchor apron 

 

Bag 5) Rail Assembly (A) 

24 Screws R/Ch 06’ 3x14 – 

To anchor corner to profile 

10 Screws 03x14 Din 7983 – 

To anchor pocket 

10 Screws 03’5x19 
6 Screws 03’2x23 
 

Bag 6) Rail Set(A), Aprons (B) Anchoring to Slates (C)

 

24 Screws Hex Din M-10x70 
24 Nuts M-10 
24 Washers 21x2 Din 127 
24 Lock Washers 10 Din 127 

Отзывы: