![Salicru EQUINOX EQX2-4002-T Скачать руководство пользователя страница 42](http://html1.mh-extra.com/html/salicru/equinox-eqx2-4002-t/equinox-eqx2-4002-t_quick-manual_3648997042.webp)
42
SALICRU
3. MECHANICAL INSTALLATION.
This section covers the process of physically inserting the new devices into the protection board of the existing installation.
Material required:
3
2
1.
Separate the IGA (automatic master circuit breaker) and ID (differential circuit breaker) protection components, leaving at least 48 mm
between them.
2.
Place the devices (ESM3T 90D24 EQX2 / ESM3T 300D50 EQX2 network analyser and the 485/WIFI 24H EQX2-T communication module)
on the protection box DIN rail in the space between the protection components.
Starting from the direction of the power supply to the system, first fit the ESM3T 90D24 EQX2 / ESM3T 300D50 EQX2 network analyser
and then the 485/WIFI 24H EQX2-T communication module:
ICP
IGA
ID
Network analyser
ESM3T 90D24 EQX2 / ESM3T 300D50 EQX2
Communication module
485/WIFI 24H EQX2-T
PIAs
3.
Ensure the lower DIN rail connector tabs have correctly clicked into place on both devices.
Содержание EQUINOX EQX2-4002-T
Страница 2: ...2 SALICRU ...
Страница 35: ...35 GUÍA RÁPIDA EQUINOX INVERSORES FOTOVOLTAICOS ES ...
Страница 38: ...38 SALICRU ...
Страница 71: ...71 QUICK GUIDE EQUINOX PHOTOVOLTAIC INVERTERS ES EN ...
Страница 74: ...74 SALICRU ...
Страница 107: ...107 GUIDE RAPIDE EQUINOX INVERSEURS PHOTOVOLTAÏQUES FR ...