Multiple cold water storage tanks MUST be 
linked in 28mm pipe work with the bottoms 
of the tanks at the same level.

Figure 2: Linked cold water tanks 

To Pump

To Cylinder

Outlet to

cylinder

Inlet

Bottom of cold 

tank must be 

cleared of debris

Outlet to pump

Fig 1

OLD STYLE DO NOT USED

Fig 2

2.3    Hot water requirements

The stored hot water temperature must not 
exceed 60-65ºC (see page 16, Stored hot 
water temperature).
The hot water supply to the pump must be 
via a Salamander approved method:
The best hot connection from the cylinder  
is either 
•    A 3⁄4” NO STOP ESSEX FLANGE. See 

Figure 3 or 

•   Alternatively a Salamander S flange or 

other approved top entry flanges. See 
page 16.

•   Never fit to top entry flange if the pump  

is fitted above the cylinder.

Figure 3: Hot water supply method

Pump at the base of cylinder

Outlets

MAX

65˚C

Pump at base of cylinder

OR ALTERNATIVELY

MAX

65°C

Indirect coil

Inlet

22mm No Stop Essex flange

with 3” dip pipe and birds beak

cut end to limit air being drawn 

into the pump.

A Salamander S flange or one

of the 1”x

3

/

4

” 

approved (22mm)

top entry flanges listed below

OR ALTERNATIVELY

22mm No Stop Essex 
flange with 76mm dip 
pipe and birds beak cut 
end to limit air being 
drawn into the pump 

Inlet

Outlets

Indirect coil

Pump inlet

Fig 3a

OLD STYLE DO NOT USED

Pump inlet

A Salamander S flange or        
one of the 22mm approved 
top entry flanges listed 
on page 16

3.   Anti-vibration  couplers 

(Hoses)

The anti-vibration (AV) couplers are designed 
to limit the transfer of pump vibration to  
the associated pipe work. All Salamander  
AV couplers are ¾“ BSP x 22mm push fit 
with built-in isolating valves. Note: the  
RSP 50 and RGP 50 are supplied with  
15mm couplers with isolating valves on  
the inlets and outlets. 

Figure 4: Isolating valves

35°

Isolating valve  

shown in  

‘ON’ position

Isolating valve  

shown in  

‘OFF’ position

5  Electrical requirements

The pump must be connected to the 
electrical supply using the mains cable 
with the attached plug. This plug must be 
connected to an accessible socket that has 
been installed in compliance with BS7671 
(I.E.E. Wiring regulations). The plug must be 
accessible at all times.
The pump must not be installed in a 
bathroom unless it is installed in an enclosed 
space accessible only with the use of a tool.
If the supply cord is damaged, it must be 
replaced by the manufacturer, its service 
agent or similarly qualified person in order to 
avoid a hazard.
Higher rated fuses must NOT be used.  
Fuses should be as per the table below:

We recommend that the pump is run for at 
least 5 minutes every 4 weeks in order to 
exercise all working parts.

35°

Do not bend hoses 

more than 35°

Do not twist or  

kink the hose

Figure 5: Couplers

Each single pump is supplied with two 
couplers; one angled and one straight.  
The angled coupler should be attached to 
the pump inlet (on the side) and the straight 
coupler should be attached to the pump 
outlet (on the top).
Each twin pump is supplied with four 
couplers; two angled and two straight.
For all pumps, the inlets are on the side of 
the pump and the outlets are on the top of 
the pump.
The AV couplers MUST only be tightened 
to finger tight plus one quarter turn. 
Mechanical tools must NOT be used to 
tighten coupler nuts as this may cause 
damage which will invalidate your warranty.

4  General plumbing

The installation must comply with the 
relevant requirements or local by-laws.
The pump MUST be mounted upright (shaft 
horizontal, not screwed down).
Jointing compounds, Boss White, hemp and 
steel wool MUST NOT be used. Solder fluxes 
must not come into contact with the pump 
or the AV couplers.
The maximum static head should be 10m 
(equivalent to 1.0 bar pressure) with the 
exception of the ESP 50 CPV pump where 
the maximum static head should be 5m 
(equivalent to 0.5 bar pressure).

Pump

Fuse

RGP Range

3 amp

RSP 50 

3 amp

RSP 75, RSP 100

5 amp

RHP 50 

3 amp

RHP 75, RHP 100

5 amp

RHP 140

7 amp

ESP 55, ESP 80, ESP 120, ESP 50 

3 amp

ESP 75, ESP 100, ESP 150

5 amp

ESP 140

7 amp

Ideally the AV couplers should be straight, 
but they must NOT be twisted or bent more 
than 35º (this invalidates the warranty). See 
Figure 5.

SAL6479 Pumps Install DocAW1 .indd   4-5

29/09/2011   11:27

Содержание RGP

Страница 1: ...Postcode 4 What is the approximate cold water storage capacity in gallons Pump serial number Model Date of purchase _____ _____ _____ 5 Where is the pump situated How far is it from the hot water cyli...

Страница 2: ...l us implement our engineers recommendation for your installation situation then ask your customer to register When the job is finished tear off the final page of this instruction manual and hand it t...

Страница 3: ...an air vent on the supply pipe work to a pump Where the pump is servicing two or more bathrooms the cold water supply to the cylinder must be in 28mm pipe work 2 2 Cold water storage Ensure that the c...

Страница 4: ...pump must be connected to the electrical supply using the mains cable with the attached plug This plug must be connected to an accessible socket that has been installed in compliance with BS7671 I E E...

Страница 5: ...per bathroom The hot connection must be via an approved side or top entry flange see page 16 Vent and other services Cold water storage MAX 65 C H C Outlet Inlet Outlet Inlet Fig 5 Right pump feeding...

Страница 6: ...tive head Usable capacity minimum 50 gallons per bathroom The hot connection must be via an approved side or top entry flange see page 16 Vent and other services Cold water storage MAX 60 C H C Outlet...

Страница 7: ...throom C Fig 10 ESP CPV single Tank fed pressurised cylinder or Combi boiler system with Right ESP CPV single pump to boost the hot supply water pressure and cold water mains supplies cold to shower b...

Страница 8: ...of cold storage The typical recovery rate of a 1 2 inch high pressure part II BS1212 ball valve is 15PSI 1 0 bar 0 97 galls min 30PSI 2 0 bar 1 34 galls min 40PSI 2 7 bar 1 58 galls min 60PSI 4 0 bar...

Страница 9: ...starvation protection pipework arrangements and stored hot water Fortic type tanks and pre assembled units Typically used in very small flats and houses Not usually with sufficient water capacity of...

Страница 10: ...of the hot supply water to the pump The No Stop Essex flange is in all circumstances the best option S flange Complete with compression pump and open vent connections Also supplied with an adaptor to...

Страница 11: ...is simply achieved by use of a cylinder thermostat and zone valve or direct acting thermostatic valve e g tapstat In systems where the stored hot water temperature is not controlled eg Aga solid fuel...

Страница 12: ...V valve Is the temperature set to 65 C maximum Fault Probable cause Recommended solution Reduced intermittent flow Incorrect or no anti aeration flange fitted Check that installation complies with Sal...

Страница 13: ...ment which shall in the opinion of the Company have proved defective by reason only of the Company s materials or workmanship providing always that the Company shall be under no obligation whatsoever...

Страница 14: ...ion PumpWise guidelines General specification Trouble shooting PumpWise and warranty Freepost RLXE JHHY HLHJ Salamander Pumps Unit 2c Colima Avenue Sunderland SR5 3XE Notes SAL6479 Pumps Install DocAW...

Отзывы: