Suntrio Plus Series

- 24 -

Chapter 5 Electrical Connection

5.1 Safety Instruction for Hot-line Job

Electrical connection must only be operated on by professional technicians. Please
keep in mind that the inverter is a bi-power supply equipment. Before connection,
necessary protective equipment must be employed by technicians including
insulating gloves, insulating shoes and safety helmet.

DANGER

· Dangerous to life due to potential fire or electricity shock.
· When power-on, the equipment should be in conformity with national rules and
regulations.
· The direct connection between the converter and high voltage power systems must be
operated by qualified technicians in accordance with local and national power grid
standards and regulations.

WARNING

·

W

hen the photovoltaic array is exposed to light, it supplies a d.c voltage to the inverter.

NOTICE

·Electrical connection should be in conformity with proper stipulations, such as
stipulations for cross-sectional area of conductors, fuse and ground protection.
·The overvoltage category on DC input port is II,and that on AC output port is III.

Содержание Suntrio Plus 15K

Страница 1: ...User Manual SAJ Solar Inverter Suntrio Plus Series www saj electric com...

Страница 2: ...ting and safety Please follow the instructions of this manual so that we can ensure delivery of our professional guidance and wholehearted service Customer orientation is forever our commitment We hop...

Страница 3: ...oducts 10 3 2 Specification for Product Model 11 3 3 Overview of products 11 3 4 Datasheet 13 Chapter 4 Instructions for installation 17 4 1 Safety Instructions 17 4 2 Pre installation Check 17 4 3 Th...

Страница 4: ...duction of Human computer Interface 32 6 2 First Run Setup 33 6 3 Monitoring Operation 42 Chapter 7 Fault Code and Troubleshooting 43 Chapter 8 Recycling and Disposal 46 Chapter 9 Guarantee Service 47...

Страница 5: ...40K Suntrio Plus 50K Suntrio Plus 60K Please keep this manual all time available in case of emergency 1 2 Safety Instructions DANGER DANGER indicates a hazardous situation which if not avoided will re...

Страница 6: ...3 Target Group Only qualified electricians who have read and fully understood all safety regulations contained in this manual can install maintain and repair the inverter Operators must be aware of t...

Страница 7: ...rage capacitors fully be discharged after disconnecting from power source WARNING The installation service recycling and disposal of the inverters must be performed by qualified personnel only in comp...

Страница 8: ...ntrio Plus Series 7 NOTICE Public utility only The PV inverter is designed to feed AC power directly to the public utility power grid do not connect AC output of the inverter to any private AC equipme...

Страница 9: ...g operation Do not touch metal plate housing during operating An error has occurred Please go to Chapter 9 Troubleshooting to remedy the error This device SHALL NOT be disposed of as residential waste...

Страница 10: ...Series 9 No unauthorized operations or modifications Any unauthorized operations or modifications are strictly forbidden if any defect or damage device person occurs SAJ shall not take any responsibi...

Страница 11: ...the requirements of public grid and send the AC into the grid Table 3 1 shows the structural diagram of the typical application system of Suntrio Plus inverters Name Description Remarks A Solar panels...

Страница 12: ...odel Suntrio Plus XK 1 Suntrio Plus represents for product name XK represents rated power XkW of inverter for example 12K means 12kW 3 3 Overview of products Figure 3 2 Overview of Suntrio Plus 12K 15...

Страница 13: ...Suntrio Plus Series 12 Figure 3 4 Overview of Suntrio Plus 40K 50K 60K...

Страница 14: ...C Power VA 13200 16500 18700 22000 Rated AC Current A 17 4 21 7 24 6 29 0 Max AC Current A 20 0 25 0 28 3 33 0 Nominal AC voltage range 3 N PE 220 380V 230 400V 240 415V 180V 280V 312V 485V Grid frequ...

Страница 15: ...Topology Transformerless Consumption at Night W 0 6 Consumption at Standby W 10 Operating Temperature Range 25 C to 60 C 45 C to 60 C with derating Cooling Method Intelligent Fan Ambient Humidity 0 t...

Страница 16: ...00 55000 60000 Rated AC Current A 36 2 43 5 58 0 72 5 87 0 Max AC Current A 42 0 50 0 65 0 80 0 90 0 Nominal AC voltage range 3 N PE 220 380V 230 400V 240 415V 180V 280V 312V 485V Grid frequency range...

Страница 17: ...ght W 0 6 Consumption at Standby W 10 Operating Temperature Range 25 C to 60 C 45 C to 60 C with derating Cooling Method Intelligent Fan Ambient Humidity 0 to 100 Non condensing Altitude 3000m 2000m p...

Страница 18: ...iate or unharmonized installation environment may jeopardize the life span of the inverter Installation directly exposed under intensive sunlight is not recommended The installation site must have goo...

Страница 19: ...erter at eye level for convenience when checking the LCD display and possible maintenance activities When mounting the inverter please consider that disassembly for service work may be required 4 3 2...

Страница 20: ...Suntrio Plus Series 19 30CM 50CM 50CM 30CM 30CM 50cm 80cm 50cm 50cm 50cm 80cm 80cm 80cm 80cm 30cm 30cm 50cm 50cm 50cm 50cm 50cm 50cm Figure 4 2 Minimum Clearance...

Страница 21: ...of the Drill Holes of the Rear Panel The position of the drill holes can be determined by using rear panel 508 5 348 120 400 457 Figure 4 3 Dimensions of Rear Panel Suntrio Plus 12K 15K 17K 20K 538 20...

Страница 22: ...2 Drill Holes and Place the Expansion Tubes According to the guides drill 3 holes in the wall as shown in Figure 4 6 4 7 4 8 in conformity with position marked in the above mentioned figure and then...

Страница 23: ...Suntrio Plus Series 22 Figure 4 7 Drill Holes Suntrio Plus 25K 33K Figure 4 8 Drill Holes Suntrio Plus 40K 50K 60K...

Страница 24: ...mounted in the mounting position by screws as shown in Figure 4 9 Figure 4 9 Mount the Rear Panel 4 4 4 Mount the Inverter Carefully mount the inverter to the rear panel Make sure that the rear part...

Страница 25: ...ricity shock When power on the equipment should be in conformity with national rules and regulations The direct connection between the converter and high voltage power systems must be operated by qual...

Страница 26: ...C Decompression valves D AC output E RS485 Port F Ground Connecting port G DC Switch 5 3 AC Side Connection Type Recommended copper cable cross section area mm external diameter mm Suntrio Plus 12K 4...

Страница 27: ...an be added into the inverter such as AC surge protection Class 2 DC suege protection Anti PID and DC fuses Them are installed in the inverters before they leave the factory 5 3 2 Feed AC cable throug...

Страница 28: ...Figure 5 4 Screw the Connector 5 3 4 Cover the lid and tighten the screws Figure 5 5 Cover the lid 5 4 DC Side Connection Cross sectional Area of Cables mm Outside Diameter of the Cables mm Scope Rec...

Страница 29: ...unpacking in order to avoid confusion for connection of cables Please connect the positive connector to the positive side of the solar panels and connect the cathode connector to the cathode side of t...

Страница 30: ...insulated enclosure a click should be heard or felt when the contact cable assembly is seated correctly 6 Fasten the lock screws on positive and negative connectors into respondent insulated enclosure...

Страница 31: ...5 GND Signal Ground 6 DSR Data Send Ready 7 RTS Request To Send 8 CTS Clear To Send 9 RI Ring Indicator 1 RS232 can externally connect with Wi Fi module For more details please refer to the operating...

Страница 32: ...nnection port should be attached to the connector as shown in Figure 5 11 and Table 5 4 Make sure the connection is tight and secure Figure 5 11 3 Ports connector Table 5 4 RS485 Assembly Sequence of...

Страница 33: ...ll off the inverter is in initializing state or countdown for grid tie C Power indicator light yellow light the power system of inverter is operating normally D Moves the cursor or the focus point to...

Страница 34: ...er will display the interface for country selection as shown in Figure 6 3 Figure 6 3 Set The Country Please press the ENT button LCD will show the countries for option Users can press or to select th...

Страница 35: ...Normal Wait Fault or Update Data name Explanation Initialization Initialization of the system Normal The inverter in normal function operation Wait The inverter in stand by state Fault A fault occurs...

Страница 36: ...enter into the selection of Graph press or to select The LCD displays daily monthly yearly and gross generating capacity 2 Settings of System Parameter Communicate Set 1 In the main LCD interface pre...

Страница 37: ...Press and then press ENT to enter into Language Time Press and to set the language date and time Grid Compliance 1 In the main LCD interface press ENT button then press to enter into Setting 2 Press a...

Страница 38: ...aph Setting Run Info About 0 3 7 7 4 11 1 14 8 18 5 22 2 25 9 29 6 kW 33 3 3 5 7 9 11 13 15 17 19 21h E Total 14 35 kWh E Today 11 33 kWh Normal Communicate Set Language Time Grid Compliance Clear Ene...

Страница 39: ...7 h T Total 4 6 h 15 07 09 15 47 Graph Setting Run Info About 0 3 7 7 4 11 1 14 8 18 5 22 2 25 9 29 6 kW 33 3 3 5 7 9 11 13 15 17 19 21h E Total 14 35 kWh E Today 11 33 kWh Normal Communicate Set Lan...

Страница 40: ...ting 2 Press and then press ENT to enter password and then enter into Reset Password Attention Please contact SAJ if you need password Power 1230W E Today 11 33 kWh T Today 1 7 h T Total 4 6 h 15 07 0...

Страница 41: ...PV2 independent 4 PV2 PV3 PV1 independent 5 PV1 PV2 PV3 Attention This mode shall be set before the inverter is connected to the power grid and don t set it when the inverter is being connected to the...

Страница 42: ...to check the equipment type series number machine code software version of display panel mainframe version of the control panel and the settings of country Power 1230W E Today 11 33 kWh T Today 1 7 h...

Страница 43: ...remotely By connecting the Internet through Ethernet module and uploading the inverter data to the server users can monitor the operational information of the inverter by web version web portal or mob...

Страница 44: ...s High Master 18 20 22 L1 L2 L3 Frequency High Master 19 21 23 L1 L2 L3 Frequency Low Master 24 25 26 L1 L2 L3 Grid Lost Error Master 27 GFCI Error Master 28 29 30 L1 L2 L3 DCI Error Master 31 Insulat...

Страница 45: ...urs frequently please contact your distributor or phone SAJ Temperature High Error Check whether the radiator is blocked whether the inverter is in too high or too low temperature if the above mention...

Страница 46: ...entioned are in normal please contact your distributor or phone SAJ Current High Check the connection status between the inverter and the grid and test whether the volt of the grid is stable or not if...

Страница 47: ...d Disposal This device should not be disposed as residential waste An Inverter that has reached the end of its life and is not required is to be returned to your dealer or you must find an approved co...

Страница 48: ...Suntrio Plus Series 47 Chapter 9 Guarantee Service Please refer to the warranty card...

Страница 49: ...Guangdong P R China Postcode 510663 Web http www saj electric com Technical Support Service Tel 86 20 6660 8588 Fax 86 20 6660 8589 E mail service saj electric com International Sales Tel 86 20 6660...

Страница 50: ...of shipment from SAJ by providing the serial number of the unit and purchased receipt whichever is shorter You can purchase the warranty extension for 10 years 15 years 20 years or 25 years but do no...

Страница 51: ...ire system modules circuits etc 6 Documentation of previous claims exchanges if applicable After receiving above information SAJ will decide how to proceed the service 1 Repaired by SAJ factory or SAJ...

Страница 52: ...nt parts including any shipping admin fee that may apply Labor Labor time fee charged for the technician who is repairing maintaining installing hardware or software and debugging the faulty product L...

Страница 53: ...m should be made directly to shipping company insurance Company as soon as the container packaging is unloaded and such damage is identified Failure to follow any all of the user manual the installati...

Страница 54: ...claim please complete the below forms and send this page to SAJ attached with the Customer s invoice For Customer to fill in Name City Country Zip Tel Fax E mail Information on Device Device type Seri...

Страница 55: ...Suntrio Plus Series 54 For Installer to fill in Modules Used Modules Per String No of String Installation Company Contractor License Number Company City Country Zip Tel Fax E mail Signature Date...

Страница 56: ...Electric CO LTD ADD SAJ Innovation Park No 9 Lizhishan Road Science City Guangzhou High tech Zone Guangdong P R China Zip 510663 Tel 86 20 6660 8588 Fax 86 20 6660 8589 Web http www saj electric com...

Отзывы: