R5
Series
- 21 -
To make sure the installation spot is suitably ventilated, if multiple SAJ on-grid olar
inverters are installed in the same area, the following safety clearance in Figure 4.2
shall be followed for proper ventilation conditions.
30CM
50CM
50CM
30CM
30CM
4.2 Installation position
4.4 Mounting Procedure
4.4.1 Mark the Positions of the Drill Holes of the Rear Panel
The mounting position should be marked as shown in Figure 4.3,Figure 4.4,Figure
4.5.
Figure 4.3 Dimensions of rear panel of R5-0.7K/1K/1.5K/2K/2.5K/3K-S1
Содержание R5-0.7K-S1
Страница 1: ...R5 Series 1...
Страница 11: ...R5 Series 10 Figure 3 4 Dimensions of R5 7K 8K S2...
Страница 26: ...R5 Series 25 Figure 4 11 Install anti theft lock...
Страница 58: ...R5 Series 57...