6.4.3 Inverter Setting Review 

After commissioning, the device info including device basic info, running info and event info can be viewed. 

Country and grid code can be viewed from initial setting.   

     

     

   

 

 

 

 

 

 

 

 

6.5 Working Modes 

6.5.1 Selecting Working Modes Procedures

 

 

 

 

 

 

     

 

 

 

 

 

 

6.5.2 Working Modes Introduction 

Self-consumption Mode:

 When the solar is sufficient, electricity generated by photovoltaic 

system will be supplied to load first, the surplus energy will be stored in battery, then the 

excess electricity will be exported to the grid. When the solar is insufficient, the battery will 

release electricity to supply load. 

Back-up Mode:

 Reserved Backup SOC setting value can be adjusted, when battery SOC is 

less than reserved SOC value, battery can only be charged, until SOC reaches reserved value, 

the battery will be stopped charging; when SOC is larger than SOC setting value, battery will 

behave as Self-use mode. 

Содержание HS-5K-S2

Страница 1: ...www saj electric com Add SAJ Innovation Park No 9 Lizhishan Road Science City Guangzhou High tech Zone Guangdong P R China GUANGZHOU SANJING ELECTRIC CO LTD HS2 AS2 Series SINGLE PHASE ALL IN ONE ENER...

Страница 2: ...ce trouble shooting and safety Please follow the instructions of this manual so that we can ensure delivery of our professional guidance and wholehearted service Customer orientation is our forever co...

Страница 3: ...Method 21 4 3 Mounting Procedure 22 4 3 1 Installation Tools 22 4 3 2 Mounting Procedure 23 5 ELECTRICAL CONNECTION 33 5 1 Additional Grounding Cable 34 5 2 AC Grid Wire and Backup Output Connection 3...

Страница 4: ...s Procedures 64 6 5 2 Working Modes Instruction 62 6 6 Export Limit Setting 65 6 6 1 APP Setting 66 6 7 Self test For Italy 66 6 8 Setting Reactive Power Control For Australia 68 6 8 1 Setup Fixed Pow...

Страница 5: ...t avoided will result in death or serious injury WARNING WARNING indicates a hazardous situation which if not avoided can result in death or serious injury or moderate injury CAUTION CAUTION indicates...

Страница 6: ...completely discharged after disconnecting from power source Please keep the power off prior to any operations Do not expose the battery to temperatures in excess of 50 C Do not subject the battery to...

Страница 7: ...ficient ventilation Do not use the battery if it is defective damaged or broken Only use the battery with compatible inverter Do not use the battery with other type of battery Make sure the battery is...

Страница 8: ...atteries 2 Do not damage the battery again shock fall trample etc 3 Keep damaged batteries away from water except to prevent an energy storage system from catching fire 4 Do not expose the damaged bat...

Страница 9: ...internally with a battery management system BMS which is used to ensure efficiency of the battery and protect the battery from operating outside its specified limitations 3 2 Specification for Product...

Страница 10: ...put 5 Display 6 BAT BAT port for parallel connection 7 Communication Port 8 Start button 9 BACKUP 10 Grid 11 Ground 12 Link Port 0 to battery module 13 4G Wi Fi Module Port 14 Release Valve Position N...

Страница 11: ...nt A 19 2 19 2 No of MPPT 2 Battery Parameters Battery Type LiFePO4 Battery Voltage Range V 85 450 Max Charging Discharging Current A 30 30 Scalability BU2 5 0 HV1 5 up to 4 battery modules Short Time...

Страница 12: ...0 50 45 derating Cooling Method Natural Convection Ambient Humidity 0 100 Non condensing Altitude 4000m 3000m Power Derating Noise dBA 35 Model HS2 3K S2 AS2 3K S HS2 3 6K S2 AS2 3 6K S HS2 4K S2 AS2...

Страница 13: ...nce is present do not open the package and contact your dealer as soon as possible 4 1 2 Scope of Delivery Please contact after sales if there are missing or damaged components Inverter Package HS2 AS...

Страница 14: ...e is cooled by natural convention and suggested an indoor installation or an installation under a sheltered place to prevent the product from exposure to direct sunlight rain and snow erosion Figure 4...

Страница 15: ...or living arears including but not limited to the following areas bedroom lounge living room study toilet bathroom theater and attic When installing the device at the garage please keep it away from d...

Страница 16: ...ep 2 Place the base on the ground make sure the edge of base is 28 34mm away from wall Place the battery module on the base and secure it with screws M4 10 Figure 4 5 Securing the battery Step 3 Stack...

Страница 17: ...emplate Remove the rubber feet for the top battery module before installing inverter Figure 4 8 Drilling holes to install inverter Step 6 Use a rubber hammer to drive the screw fixing seat into the ho...

Страница 18: ...battery system Step 1 Assemble the bracket and secure it with screws Figure 4 10 Assembling the bracket Step 2 Mark the proper positions of mounting bracket and drill holes on those positions 14mm in...

Страница 19: ...f rubber feet on bracket and use a screw M4 10 to secure it with locking brackets Figure 4 12 Install the locking bracket Step 4 Install the locking brackets inverter with screws M6 12 onto the invert...

Страница 20: ...te Remove the rubber feet for the top battery module before installing inverter Figure 4 14 Drilling holes for installation of Inverter Step 6 Use a rubber hammer to drive the screw fixing seat into t...

Страница 21: ...protective equipment must be employed by technicians including insulating gloves insulating shoes and safety helmet WARNING Connect this additional grounding cable before other electrical connection N...

Страница 22: ...14 13 3 8 10 8 37 Table 5 1 Recommended AC cable specification Note If the grid connection distance is too far please select an AC cable with larger diameter as per the actual condition Power cable co...

Страница 23: ...perly 5 2 2 External AC Circuit Breaker and Residual Current Device Please install a two pole circuit breaker to ensure the inverter is able to disconnect from grid safely The integrated leakage curre...

Страница 24: ...Connector Assembly WARNING Dangerous to life due to electric shock when live components or DC cables are touched The PV panel string will produce lethal high voltage when exposed to sunlight Touching...

Страница 25: ...ert the positive and negative cable into positive and negative connector Gently pull the cables backward to ensure firm connection Figure 5 8 Inserting crimped cables to connectors 5 Fasten the lock s...

Страница 26: ...operation during battery wiring 3 Please use the battery cable in original package Thread the communication cable through the waterproof cable gland and connect to the corresponding port Figure 5 12 C...

Страница 27: ...ck Installation Guide in https www saj electric com 5 5 Connecting Battery COMM Cable Step1 Connect link port 0 of inverter to link port 1 of battery 4 the battery number can be varied it should be de...

Страница 28: ...s in the system Step 2 Connect power cable from B port of battery 4 to B port of battery 3 Step 3 Repeat step 2 to connect the rest of the battery modules Step 4 Connect the B of inverter to B of batt...

Страница 29: ...and earthing bar must be grounded properly Otherwise backup function may be inactive during blackout AS2 Series The system connection in Germany Australia and New Zealand is as below the neutral cabl...

Страница 30: ...em connection for grid system without special requirements is as below Note The backup PE line and earthing bar must be grounded properly Otherwise backup function may be inactive during blackout 5 8...

Страница 31: ...Figure 5 16 Installing side covers for battery module 5 10 AFCI Optional The inverter is equipped with arc fault circuit interrupter AFCI With AFCI protection when there is an arc signal on the DC sid...

Страница 32: ...tep 1 Turn on the circuit breaker Step 2 Press and hold the main switch for 2 3s until the display is on 6 1 2 Shut Down Step 1 Press and hold the main switch for 5s until the display is off Step 2 Tu...

Страница 33: ...porting and exporting at all Off Off grid Battery Solid Battery is discharging On 1s off 1s Battery is charging On 1s off 3s SOC low Off Battery is disconnected or inactive Grid Solid Connected to gri...

Страница 34: ...e the LED indicators on the inverter to ensure the inverter is running properly 6 4 eSAJ APP Connection 6 4 1 Account Login Step 1 Log in to eSAJ Home if you do not have an account please register fir...

Страница 35: ...Local Connection Step 3 Enter password 123456 Step 4 Click on Bluetooth and activate the Bluetooth function on your phone then click on Next Step 5 Choose your inverter according to your inverter SN...

Страница 36: ...ent electricity generated by photovoltaic system will be supplied to load first the surplus energy will be stored in battery then the excess electricity will be exported to the grid When the solar is...

Страница 37: ...each other Method 1 Export limitation setting is to control the export electricity to the grid Method 2 Generation limit is to control the electricity generated by the inverter 6 7 Self test For Italy...

Страница 38: ...e your corresponding Grid Code from Initial Setting Step 3 You can choose self test item required Individual self test time is approx 5 minutes All self test time is approx 40 minutes After the self t...

Страница 39: ...ed Reactive Power Mode Step 1 Select Inductive Adjustment Var or Capacitive Var according to your local grid regulation The power range is from 60 Pn 60 Pn 6 8 2 Setup V Watt and Volt Var Mode This in...

Страница 40: ...liance with your local grid via eSAJ Home 2 Log in to eSAJ Home click Local Connection for connection procedure please refer to chapter 5 3 for Nearby monitoring 3 Click V Watt V Var to enter DNSPs se...

Страница 41: ...temperature as 20 C 40 C humidity 85 RH 3 For long term storage 3 months please put it in an environment with a temperature of 25 C to 25 C and a humidity of 85 RH 4 The battery should be stored in a...

Страница 42: ...gh 66 Slave Phase3 Voltage Low 67 Slave Frequency High 68 Slave Frequency Low 73 Slave No Grid Error 74 PVInputModeFault 75 HWPVCurrHighFault Code Fault Information 1 Master Relay Error 2 Master EEPRO...

Страница 43: ...ation Error 98 Battery Module Sequence Error 99 Discharge Overcurrent Protection 100 Charge Overcurrent Protection 101 Module Under Voltage Protection 102 Module Over Voltage Protection 103 Single Cel...