SAJ H2 Series Скачать руководство пользователя страница 24

41

42

Master Relay Error

Master EEPROM Error

Master Temperature High Error

Master Temperature Low Error

Master Lost Communication M<->S

Master GFCI Device Error

Master DCI Device Error

Master Current Sensor Error

Master Phase1 Voltage High

10 

Master Phase1 Voltage Low

11 

Master Phase2 Voltage High

12 

Master Phase2 Voltage Low

13 

Master Phase3 Voltage High

14 

Master Phase3 Voltage Low

15 

Master Voltage 10Min High

18 

Master Grid Frequency High

19 

Master Grid Frequency Low

21 

Master  Phase1 DCV Error

22 

Master  Phase2 DCV Error

23 

Master  Phase3 DCV Error

24 

Master No Grid Error

27 

Master GFCI  Error

28 

Master Phase1 DCI Error

29 

Master Phase2 DCI Error

30 

Master Phase3 DCI Error

31 

Master ISO Error

32 

Master Bus Voltage Balance Error

33 

Master Bus Voltage High

34 

Master Bus Voltage Low

35 

Master Grid Phase Error

36 

Master PV Voltage High Error

37 

Master Islanding Error

38 

Master HW Bus Voltage High

39 

Master HW PV Current High

40 

Master SelfTestFailed

41 

Master HW Inv Current High

42 

Master AC SPD Error

43 

Master DC SPD Error

44 

Master Grid NE Voltage Error

45 

Master Fan1 Error

46 

Master Fan2 Error

47 

Master Fan3 Error

48 

Master Fan4 Error

49 

Lost Communication between DSP and PowerMeter

50 

Lost Communication between M<->S

load PowerMeter"

52 

HMI EEPROM Error

53 

HMI RTC Error

54 

BMS Device Error

55 

BMS Lost.

Conn  

Warn

56 

CT Device Err

57 

AFCI Lost Err

61 

Slave   Phase1 Voltage High

62 

Slave Phase1 Voltage Low

63 

Slave Phase2 Voltage High

64 

Slave Phase2 Voltage Low

65 

Slave Phase3 Voltage High

66 

Slave Phase3 Voltage Low

67 

Slave Frequency High

68 

Slave Frequency Low

73 

Slave No Grid Error

74 

PVInputModeFault

75 

HWPVCurrHighFault

76 

Slave PV Voltage High Error

77 

HWBusVoltHighFault

81 

Lost Communication D<->C

83 

Master Arc Device Error

84 

Master PVInput Error

85 

Authority expires

86 

Master DRM0 Error

87 

Master Arc Error

88 

Master SW PV Current High 

94 

Master Output OverLoad

Содержание H2 Series

Страница 1: ...H2 5 10K T2 ...

Страница 2: ......

Страница 3: ......

Страница 4: ......

Страница 5: ......

Страница 6: ......

Страница 7: ......

Страница 8: ...put Back up Mode Max Output Power VA Max Output Current A Rated Output Voltage V Rated Output Frequency Hz Total Harmonic Distortion of Voltage Peak Output Apparent Power VA H2 5K 6K 8K 10K T2 H2 5K T2 H2 6K T2 H2 8K T2 H2 10K T2 MODEL Efficiency Max Efficiency Euro Efficiency MPPTEfficiency Max Battery Charging Discharging Efficiency Protection ACShort Circuit Protection Overload Protection Resid...

Страница 9: ......

Страница 10: ......

Страница 11: ......

Страница 12: ......

Страница 13: ...4 3 Ground Connection 4 4 AC Grid Wire and Backup Output Connection 2 5 6 0 4 0 Additional grounding cable cross sectional area mm 4 ...

Страница 14: ...ed Enclosure 2 Lock Screw3 Positive Negative Connector Please place the connector separately after unpacking in order to avoid confusion for connection of cables Please connect the positive connector to the positive side of the solar panels and connect the negative connector to the negative side of the solar side Be sure to connect them in right position 4 During off grid operation time PE line at...

Страница 15: ...t terminals of the inverter a click sound should be heard when the contact cable assembly is seated cor rectly Figure4 8 Connect to the Inverter Before insert the connector into DC input terminal of the inverter please make sure that the DC switch of the inverter is OFF Please use the original H4 terminal to install Procedure 1 Open the waterproof cover then feed the battery cable through the AC w...

Страница 16: ... Battery temperature can be detected by temperature sensor that integrated in the battery module and the temperature data can be reviewed on eSAJ App 4 8 2 RJ45 Pin Port Definition Figure 4 13 9 Pin serial port BMS EMS METER PORT1 PORT0 RS485 A R CT I R CT 1 S CT 1 S CT I T CT 1 T CT 1 RS485 B ...

Страница 17: ...is as below Note The backup PE line and earthing bar must be grounded properly Otherwise backup function may be inactive during blackout BAT H2 Inverter AC BACKUP GRID RCD Normal Loads R C D Backup Loads Smart meter Distribution box L3 N PE L1 L2 L3 N PE L1 L2 METER L3 N PE L1 L2 L 3 N PE L1 L 2 L3 N PE L1 L2 BMS PV BAT L3 N PE AC BACKUP GRID Normal Loads RCD Backup Loads Smart meter L3 N PE Distr...

Страница 18: ...nal current leakage When a leakage current detected exceeds the limitation the inverter will be disconnected from grid quickly if an external residual current device is connected the action current should be 30mA or higher Caution For safety operation and regulation compliance it is requested to install a breaker 32A between grid and inverter 30 29 CT wire Corresponding port in meter IA white 13 i...

Страница 19: ......

Страница 20: ...ctivate the Bluetooth function on your phone then click on Next Choose your inverter according to your inverter SN s tail numbers Click on the inverter to enter inverter setting Select the corresponding country and grid code for initial setting please contact your local grid operator for which grid compliance to select eSAJ Home 5 3 eSAJ APP Connection ...

Страница 21: ...sted when battery SOC is less than reserved SOC value battery can only be charged until SOC reaches reserved value the battery will be stopped charging when SOC is larger than SOC setting value battery will behave as Self use mode Time of use Mode Battery charging period and discharging period can be set during charging period battery can only be charged while in discharging period battery can onl...

Страница 22: ...ing the self testing time inverter will check the reaction time for over frequency under frequency overvoltage and undervoltage This self test is to ensure the inverter is able to disconnect from grid when required If the self test fails the inverter will not able to feed into the grid The steps of running Self test are as followed You can choose self test item required Individual self test time i...

Страница 23: ...as been set during production please select corresponding grid compliance according to state regulation during installation You can choose a state regulation compliance with your local grid via eSAJ Home 2 Log in to eSAJ Home click Local Connection for connection procedure please refer to chapter 5 3 for Nearby monitoring 3 Click V Watt V Var to enter DNSPs settings choose a suitable state regulat...

Страница 24: ...e High Error 37 Master Islanding Error 38 Master HW Bus Voltage High 39 Master HW PV Current High 40 Master SelfTestFailed 41 Master HW Inv Current High 42 Master AC SPD Error 43 Master DC SPD Error 44 Master Grid NE Voltage Error 45 Master Fan1 Error 46 Master Fan2 Error 47 Master Fan3 Error 48 Master Fan4 Error 49 Lost Communication between DSP and PowerMeter 50 Lost Communication between M S lo...

Страница 25: ...e 510663 Web http www saj electric com Technical Support Service Tel 86 20 6660 8588 Fax 86 206660 8589 E mail service saj electric com International Sales Tel 86 20 66608618 66608619 66608588 66600086 Fax 020 66608589 E mail info saj electric com Domestic Sales Tel 020 66600058 66608588 Fax 020 66608589 8 Contact SAJ 43 44 ...

Отзывы: