Before dismantling the pump, check the following: 

• 

The air/nitrogen supply is OFF, 

• 

The chemical and discharge lines are empty, and there is no pressure, 

• 

All in line valves are closed, 

• 

You follow your local Health and Safety regulations with regard to particular chemicals. 

 

V.2 – Preventive maintenance 

 

Important: for “W” pumps, PTFE body seals (P/N 2593, Mark C) and PFA manifold seals  
(P/N 2592, Mark F) must be changed each time you disassemble the pump. For “G” pumps, 
PTFE body seals (P/N 2593, Mark C) must be changed each time you disassemble the pump.  
Retighten manifold nuts simultaneously and progressively with a strap wrench in order to 
ensure a correct tightness. 

 

V.2.1 – Continuous operation 

 
When the pump is used continuously, it is necessary to replace the following parts every year: 

• 

Central shaft O.rings  

P/N 2496 

• 

Central shaft 

P/N 2477 

Important: the central rod and central rod O.rings should always be replaced together. 

 
During routine maintenance checks, examine the following parts, and change them if necessary: 

• 

Bellows 

P/N 6530 (PFD) or 2309S (PFS) 

• 

Shuttle valve system 

P/N 2493 

• 

Viton bellows O.rings 

P/N 4813 

• 

FEP body O.rings 

P/N 2491S  

• 

Manifold O.rings 

P/N 2632S and 2632K 

• 

Suction lip seals 

P/N 2629 (PFD) or 2629A (PFS) 

• 

Delivery lip seals 

P/N 2630 (PFD) or 2630A (PFS) 

• 

Check valves 

P/N 2633 

• 

Silencers 

P/N 2494 

 

V.2.2 – Intermittent operation 

 
If the pump is used intermittently, it is advised to replace all wearing parts every 18 months (shaft 
composite rings and central shaft) and to check other parts (bellows, shuttle valve system, other 
O.rings, lip seals...). 
If the pump is left standing full of chemical for long periods all the Viton O.rings should be replaced. 
 

V.3 – Comments 

 
If the pump is used to pump hot chemicals in excess of 140°F (60

°

C) the preventive maintenance 

schedule time scale should be divided by 2: 

• 

Every 6 months check as for continuous operation, 

• 

Every 9 months check as for intermittent operation. 

 

The above is based on SGPPL ASTI’s experience. 
SGPPL ASTI cannot be held responsible for premature failures if the pump is misused, or 
damaged due to an incorrect application. 

 

Содержание PFD4 AstiPure

Страница 1: ...uarters Factory 41 boulevard des Bouvets E A D A C des Berthilliers F 92741 NANTERRE CEDEX F 71850 CHARNAY LES MACON Tel 33 0 1 55 68 59 59 Tel 33 0 3 85 20 27 00 Fax 33 0 1 55 68 59 68 Fax 33 0 3 85...

Страница 2: ...nce 5 V 1 Trouble shooting V 2 Preventive maintenance V 2 1 Continuous operation V 2 2 Intermittent operation V 3 Comments VI Dismantling and Repair 7 VI 1 How to dismantle VI 2 Examination VI 3 Strip...

Страница 3: ...The pumping frequency of a bellows pump is much slower than an equivalent diaphragm pump and results in an extended life for the bellows Pulsation dampers with wetted parts in TEFLON PFA and PTFE are...

Страница 4: ...The pump must be connected to a clean dry air or nitrogen supply On no account should the air nitrogen supply be lubricated oil or water droplets will cause the shuttle valve to malfunction Minimum an...

Страница 5: ...rod nuts are tight Because of the material of these tie rods tightening of couple must be controlled we recommend 7 N m Maximum is 10 N m The air nitrogen supply is dry clean and between 29 and 72 5 P...

Страница 6: ...mon applications are Semiconductor Industry Transfer of ultrapure and corrosive chemicals Pump filter recirculation systems Pharmaceuticals and Chemicals Chemical injection and sampling IV 5 Limitatio...

Страница 7: ...placed together During routine maintenance checks examine the following parts and change them if necessary Bellows P N 6530 PFD or 2309S PFS Shuttle valve system P N 2493 Viton bellows O rings P N 481...

Страница 8: ...PFD4 and a preventive maintenance box P N PM PFD4 PM PFS4 PM PFD4G or PM PFS4G For more details on these kits please report to appendix documents VI 3 1 Replacing the shuttle valve system The valve i...

Страница 9: ...bow connectors If your pump is marked with W change the manifold seals P N 2592 Mark F and retighten progressively with a strap wrench NB This chapter does not concern PFD S4 G pumps that have no mani...

Страница 10: ...E PN10 DN25 ETFE NUT 2 2 2471 PFD4 PFA BODY 2 2 2 2 2471G PFD4 TG PFA BODY 2 2 2 2 2472 1 2 BODY A 1 1 1 1 2473 1 2 BODY B 1 1 1 1 2474 CORE 1 1 1 1 2477 CENTRAL SHAFT 1 1 1 1 2478 PNEUMATIC SCREW 2 2...

Страница 11: ...68 http www astipure com http www plastics saint gobain com PFD4 PUMP SERIES 3 PFS4 PART NUMBER DESIGNATION QUANTITY PFD4 PFS4 322 325 322 325 3134 PNEUMATIC O RING 2 2 2 2 4813 VITON BELLOW O RING 2...

Страница 12: ...4 INLET LIP SEAL 2 2 2630 PFD4 OUTLET LIP SEAL 2 2 2632K KALREZ MANIFOLD O RING 2 2 2632S FEP MANIFOLD O RING 2 2 2633 VALVE 4 4 2716 SHUTTLE VALVE O RING 2 3134 PNEUMATIC O RING 2 4813 VITON BELLOW O...

Страница 13: ...T O RING 2 2593 PFD4 WWES BODY SEAL 2 2629 PFD4 INLET LIP SEAL 2 2630 PFD4 OUTLET LIP SEAL 2 2633 VALVE 4 2716 SHUTTLE VALVE O RING 2 3134 PNEUMATIC O RING 2 4813 VITON BELLOW O RING 2 6530 PFD4 BELLO...

Страница 14: ...TI 41 Boulevard des Bouvets 92000 Nanterre France Tel 33 0 1 55 68 59 59 Fax 33 0 1 55 68 59 68 http www astipure com TM 14 09 01 V rifi par En date du 4x 2633 2x D F 2474 2x 2478 2x 3134 2x 2404 2x 2...

Страница 15: ...593 2430G or 2435G 2471G Z P N M Z MS21 or 2430GZ or 2435GZ A Shuttle valve system B Bellow C Body O ring D Suction lip seal E Delivery lip seal F Manifold O ring G Manifold H Nut I Pump body PF S 4 3...

Страница 16: ...4 APP 4 EXT 00 S S S SG G G GP P P PP P P PL L L L A A A AS S S ST T T TI I I I 41 Boulevard des Bouvets F 92741 Nanterre Cedex FRANCE Tel 33 0 1 55 68 59 59 Fax 33 0 1 55 68 59 68 264mm 10 39 360 8m...

Страница 17: ...4 pump flow rate characteristics 0 0 5 1 1 5 2 2 5 3 3 5 4 4 5 900 1400 1900 2400 2900 3400 3900 4400 4900 5400 Flow rate l h Discharge head bar Air supply 5 bar Air supply 4 bar Air supply 3 bar Air...

Страница 18: ...4 pump flow rate characteristics 0 0 5 1 1 5 2 2 5 3 3 5 4 4 5 400 900 1400 1900 2400 2900 3400 3900 4400 4900 Flow rate l h Discharge head bar Air supply 5 bar Air supply 4 bar Air supply 3 bar Air s...

Страница 19: ...SG G G GP P P PP P P PL L L L A A A AS S S ST T T TI I I I 41 Boulevard des Bouvets F 92741 Nanterre Cedex FRANCE Tel 33 0 1 55 68 59 59 Fax 33 0 1 55 68 59 68 REFOULEMENT FLUIDE FLUID OUTLET ASPIRATI...

Отзывы: